Bldgs. 12 and 12A - Approved All Normal Power Shutdown

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Apr 2 14:27:33 2002

Message-ID: <568F0AEE7A57D511923900508B55645101231CE6@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: RM-Utl <rm-utl@mit.edu>, RM-3rdShift <rm-3rdshift@mit.edu>,
        Paul Stordy <PStordy@PLANT.MIT.EDU>,
        Manuel Moreira
	 <mmoreira@PLANT.MIT.EDU>,
        James Sullivan <jsulliva@PLANT.MIT.EDU>,
        "'dcosta@mit.edu'" <dcosta@mit.edu>,
        "'safety@mit.edu'" <safety@mit.edu>,
        "'johnnyd@mit.edu'" <johnnyd@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>, C-Zone <C-Zone@mit.edu>,
        Cust-Coach <cust-coach@mit.edu>,
        "'sgilliga@mit.edu'" <sgilliga@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>
Date: Tue, 2 Apr 2002 14:27:27 -0500 
MIME-Version: 1.0
Content-Type: text/plain

> To: 	RM-Utl; RM-3rdShift; Paul Stordy; Manuel Moreira; James Sullivan;
> dcosta@mit.edu; safety@mit.edu; johnnyd@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; C-Zone; Cust-Coach;
> sgilliga@mit.edu; shutdowns@mit.edu
> Subject: 	Bldgs. 12 and 12A - Approved All Normal Power Shutdown
> 
> 
The following approved all normal power shutdown for Bldgs. 12 and 12 A on
Thursday, 4/4 PM to Friday, 4/5 AM is for your information.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 12 and 12A
> Date: 4/4/2002
> Day: Thursday
> Time: 11 PM (4/4) - 7 AM (4/5)
> System: All Normal Power
> Duration: 8 hours
> Reason: 
> Cut and cap a cable.
> 
> Effect: 
> Loss of Power:  access controls, building power, computers,
> lighting/corridors-stairs;  Water: chilled water (air conditioning), hot
> domestic (for bathroom, kitchen, lab sinks), hot lab process (for lab
> equipment), cold domestic (toilets, bathroom, kitchen and lab sink
> faucets, drinking fountains) and cold lab process (for lab equipment; Air,
> supply ventilation (air from outside), supply cooling, supply heating (via
> ceiling supply fans), exhaust-laboratory (labs), exhaust-general,
> exhaust-toilet, compressed control, compressed lab air and lab vacuum air;
> Steam:  Condensate return for ventilation.
> 
> 