Bldg. 12 and 12A - All Normal Power Shutdown Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Mar 28 12:57:32 2002

Message-ID: <568F0AEE7A57D511923900508B55645101231C99@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'bkaynor@mit.edu'" <bkaynor@mit.edu>, C-Zone <C-Zone@mit.edu>,
        "'caferrar@mit.edu'" <caferrar@mit.edu>,
        Cust-Coach <cust-coach@mit.edu>,
        "'granvill@mit.edu'" <granvill@mit.edu>,
        "'jbartels@MIT.EDU'"
	 <jbartels@mit.edu>,
        "'jcentor@mit.edu'" <jcentor@mit.edu>,
        "'momeara@mit.edu'" <momeara@mit.edu>,
        "'rigione@mit.edu'"
	 <rigione@mit.edu>,
        "'schedule@mit.edu'" <schedule@mit.edu>,
        "'cgroves@mit.edu'" <cgroves@mit.edu>,
        "'sburke@mit.edu'"
	 <sburke@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>,
        "'safety@mit.edu'" <safety@mit.edu>,
        "'johnnyd@mit.edu'"
	 <johnnyd@mit.edu>, "'ndk@mit.edu'" <ndk@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Thu, 28 Mar 2002 12:57:29 -0500
MIME-Version: 1.0
Content-Type: text/plain

> To: 	bkaynor@mit.edu; C-Zone; caferrar@mit.edu; Cust-Coach;
> granvill@mit.edu; jbartels@MIT.EDU; jcentor@mit.edu; momeara@mit.edu;
> rigione@mit.edu; schedule@mit.edu; cgroves@mit.edu; sburke@mit.edu;
> shutdowns@mit.edu; safety@mit.edu; johnnyd@mit.edu; ndk@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 12 and 12A - All Normal Power Shutdown Request
> 
> 
The following all normal power shutdown request for Bldgs. 12 and 12A on
Thursday, April 4 PM is for your information and comment.  Would you please
let me know whether this does or does not meet with your approval.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872 

> Status: Normal
> Building: 12 and 12A
> Date: 4/4/2002
> Day: Thursday
> Time: 11 PM - 7 AM
> System: All Normal Power
> Duration: 8 hours
> Reason: 
> Cut and cap a cable.
> 
> Effect: 
> Loss of Power:  access controls, building power, computers,
> lighting/corridors-stairs;  Water: chilled water (air conditioning), hot
> domestic (for bathroom, kitchen, lab sinks), hot lab process (for lab
> equipment), cold domestic (toilets, bathroom, kitchen and lab sink
> faucets, drinking fountains) and cold lab process (for lab equipment; Air,
> supply ventilation (air from outside), supply cooling, supply heating (via
> ceiling supply fans), exhaust-laboratory (labs), exhaust-general,
> exhaust-toilet, compressed control, compressed lab air and lab vacuum air;
> Steam:  Condensate return for ventilation.
> 
> 