Bldgs. 33 and 35 Revised Building Power Shutdown

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Mar 25 09:28:38 2002

Message-ID: <568F0AEE7A57D511923900508B55645101231C38@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: B-Zone <B-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
        "'gallant@mit.edu'" <gallant@MIT.Edu>,
        "'gerwent@mit.edu'"
	 <gerwent@MIT.Edu>,
        "'inslee@mit.edu'" <inslee@MIT.Edu>,
        "'schedule@mit.edu'" <schedule@MIT.Edu>,
        "'stiffler@mit.edu'"
	 <stiffler@MIT.Edu>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        Billy Homeyer
	 <whomeyer@PLANT.MIT.EDU>,
        Warren Scott <WScott@PLANT.MIT.EDU>
Date: Mon, 25 Mar 2002 09:28:35 -0500
MIME-Version: 1.0
Content-Type: text/plain

> To: 	B-Zone; Cust-Coach; gallant@mit.edu; gerwent@mit.edu;
> inslee@mit.edu; schedule@mit.edu; stiffler@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu; Billy Homeyer; Warren Scott
> Subject: 	Bldgs. 33 and 35 Revised Building Power Shutdown
> 
> 
The following revised Critical building power shutdown for  Bldg. 33 and 35
on Friday, 3/29 PM through Sunday, 3/31 PM is for your information and
comment.  Would you please let me know whether this revised shutdown does or
does not meet with your approval.  

Thank you again for your time.

Andrea Nichols
Repair and Maintenance
8-7872




> Status: Critical
> Building: 33 and 35
> Date: 3/29/2002
> Day: Friday
> Time: 8 PM (3/29 - 8 PM (3/31)
> System: Building Power
> Duration: 48 hours
> Reason: 
> Fire proofing the electrical switchgear room 33-022 Utilities Mech. Rm.
> 
> Effect: 
> Loss of building power, elevators, computers, lighting (corridors/stairs);
> Water: chilled water (air conditioning), hot and cold domestic water
> (affects toilets, bathroom, kitchen, lab sink faucets); Air: supply
> ventilation, supply cooling and supply heating (via ceiling supply fans),
> exhaust-general, exhaust-toilet, compressed control and and compressed lab
> air; Steam:  Condensate Return; Drainage: Sanitary; Other: Exhaust Hood
> during the 48-hour shutdown period.
> 
> 