[58773] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. 18 - Critical Domestic/Lab Process Water, Sanitary Drainage

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Mar 22 10:39:24 2002

Message-ID: <568F0AEE7A57D511923900508B55645101231C20@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.Edu>, "'chemistryhq@mit.edu'" <chemistryhq@MIT.Edu>,
        Cust-Coach <cust-coach@MIT.Edu>, "'gsj@mit.edu'" <gsj@MIT.Edu>,
        "'rjwilk@mit.edu'" <rjwilk@MIT.Edu>,
        "'serotek@mit.edu'"
	 <serotek@MIT.Edu>,
        "'efrank@mit.edu'" <efrank@MIT.Edu>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 22 Mar 2002 10:39:12 -0500
MIME-Version: 1.0
Content-Type: text/plain

> To: 	A-Zone; chemistryhq@mit.edu; Cust-Coach; gsj@mit.edu;
> rjwilk@mit.edu; serotek@mit.edu; efrank@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 18 - Critical Domestic/Lab Process Water, Sanitary
> Drainage Shutdown Request
> 
> 
The following Critical Domestic/Lab Process Hot and Cold Water and Sanitary
Drainage shutdown request for Bldg. 18 - Bathrooms, Kitchens, Safety
Showers, Eye Wash Stations on Tuesday, 3/26 is for your information and
comment.  Would you please let me know whether this does or does not meet
with your approval.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Critical
> Building: 18 - Bathrooms, Kitchen, Safety Showers, Emergency Eye Wash
> Stations
> Date: 3/26/2002
> Day: Tuesday
> Time: 6 PM - 10 PM
> System: Domestic/Lab Process Hot and Cold Water and Sanitary Drainage 
> Duration: 4 hours
> Reason: 
> Eliminate cross connect from existing emergency water to tempered water -
> make piping change at bottom of  shaft #3 to make way for 4" electrical
> conduit.
> 
> Effect: 
> Loss of domestic hot and cold water (affects toilets, bathroom, kitchen
> and lab sink faucets and drinking fountains; hot and cold lab process
> water  (affects safety showers, emergency eyewash stations, and sanitary
> drainage and lab equipment requiring use of same to operate) during the
> 4-hour Critical shutdown period.
> 
> 

home help back first fref pref prev next nref lref last post