[57794] in Hotline Meeting
Bldgs. E17, E19 and E18 Critical Sul-Air Control Air Shutdown Req
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jan 4 10:45:01 2002
Message-ID: <568F0AEE7A57D511923900508B5564511561A2@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'kshooter@mit.edu'" <kshooter@mit.edu>,
"'tmeehan@mit.edu'"
<tmeehan@mit.edu>,
"'lsanto@mit.edu'" <lsanto@mit.edu>,
"'schedule@mit.edu'" <schedule@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'bengel@mit.edu'" <bengel@mit.edu>, "'wardd@mit.edu'" <wardd@mit.edu>,
"'dudley@mit.edu'" <dudley@mit.edu>,
"'jmganno@mit.edu'" <jmganno@mit.edu>,
"'lombardo@mit.edu'"
<lombardo@mit.edu>,
"'sdalton@mit.edu'" <sdalton@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
E-Zone
<E-Zone@mit.edu>
Date: Fri, 4 Jan 2002 10:44:56 -0500
MIME-Version: 1.0
Content-Type: text/plain
> To: kshooter@mit.edu; tmeehan@mit.edu; lsanto@mit.edu; schedule@mit.edu;
> shutdowns@mit.edu; bengel@mit.edu; wardd@mit.edu; dudley@mit.edu;
> jmganno@mit.edu; lombardo@mit.edu; sdalton@mit.edu
> Cc: shutdown@plant.mit.edu; E-Zone
> Subject: Bldgs. E17, E19 and E18 Critical Sul-Air Control Air
> Shutdown Request
>
>
The following Critical shutdown request for Bldgs. E17, E18-CRC only and E19
- 4th floor only on Monday, 1/7 is for your information and comment. Would
you please let me know whether this does or does not meet with your
approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Critical
> Building: E17, E19 - 4th floor only and E18 - CRC only
> Date: 1/7/2002
> Day: Monday
> Time: 8 AM - 9 AM
> System: Sul-Air Control Air
> Duration: 1 hour
> Reason:
> High pressure air leak.
>
> Effect:
> Loss of chilled water (air conditioning) heating hot water (for
> buildings), supply ventilation (air from outside), supply cooling (from
> ceiling supply fans), supply heating (from ceiling supply fans),
> compressed control air which affects all of the afore-mentioned systems
> during the 1-hour shutdown period.
>
>