Bldg. 36 - Air Handler 8 Shutdown Test

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Jan 3 14:53:46 2002

Message-ID: <568F0AEE7A57D511923900508B556451156190@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'amcgurl@rle.mit.edu'" <amcgurl@rle.mit.edu>, B-Zone <B-Zone@MIT.Edu>,
        Cust-Coach <cust-coach@MIT.Edu>,
        "'schedule@mit.edu'" <schedule@MIT.Edu>,
        "'wrgibbs@rle.mit.edu'" <wrgibbs@rle.mit.edu>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@MIT.Edu>,
        Operators
	 <Operators@PLANT.MIT.EDU>,
        "'nmorriso@mit.edu'" <nmorriso@MIT.Edu>, "'rpc@mit.edu'" <rpc@MIT.Edu>
Date: Thu, 3 Jan 2002 14:53:37 -0500 
MIME-Version: 1.0
Content-Type: text/plain

> To: 	amcgurl@rle.mit.edu; B-Zone; Cust-Coach; schedule@mit.edu;
> wrgibbs@rle.mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators;
> nmorriso@mit.edu; rpc@mit.edu
> Subject: 	Bldg. 36 - Air Handler 8 Shutdown Test
> 
> 
The following Air Handler 8 shutdown request for Bldg. 36 - South Side -
Floors 2 through 8 on Friday, 1/4 is for your information. If you have any
question about this, please contact Bob Cunkelman at 3-6371.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 36 - South Side - Floors 2 through 8
> Date: 1/4/2002
> Day: Friday
> Time: 5 AM - 3 PM
> System: Air Handler 8
> Duration: 10 hours
> Reason: 
> Testing the ability of the perimeter baseboard system to provide adequate
> heat, without the Air Handler Unit operating.
> 
> Effect: 
> Loss of supply ventilation and supply heating in 36 - south side - floors
> 2 through 8 during the testing period.  It is hoped the ability of the
> perimeter baseboard system will provide adequate heat.
> 
> 