[57608] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. 35 - Reduced Pressure of Domestic Water

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Dec 11 15:08:02 2001

Message-ID: <568F0AEE7A57D511923900508B55645115607D@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: B-Zone <B-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
        "'gallant@mit.edu'" <gallant@MIT.Edu>,
        "'gerwent@mit.edu'"
	 <gerwent@MIT.Edu>,
        "'inslee@mit.edu'" <inslee@MIT.Edu>,
        "'schedule@mit.edu'" <schedule@MIT.Edu>,
        "'stiffler@mit.edu'"
	 <stiffler@MIT.Edu>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.Edu>,
        Frank Lewis <flewis@PLANT.MIT.EDU>,
        "'nmorriso@mit.edu'"
	 <nmorriso@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@MIT.Edu>
Date: Tue, 11 Dec 2001 15:07:59 -0500
MIME-Version: 1.0
Content-Type: text/plain

> To: 	B-Zone; Cust-Coach; gallant@mit.edu; gerwent@mit.edu;
> inslee@mit.edu; schedule@mit.edu; stiffler@mit.edu; shutdowns@mit.edu;
> Frank Lewis; nmorriso@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu
> Subject: 	Bldg. 35 - Reduced Pressure of Domestic Water
> 
> 
The following possible reduction in pressure for hot and cold domestic
water, hot and cold lab process water for Bldg. 35 on Wednesday, 12/12 is
for your information.

If you have any question about this, please contact Frank Lewis at x3-6352.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Normal
> Building: 35
> Date: 12/12/2001
> Day: Wednesday
> Time: 8 AM - 4 PM
> System: Domestic/Lab Process Water
> Duration: 9 hours
> Reason: 
> Relocate 6" water service in Vassar Street to accommodate new storm drain.
> 
> Effect: 
> Water will be run from a hose via Bldg. 31. May notice reduced pressure in
> hot and cold domestic water (for toilets, bathroom, kitchen and lab sink
> faucets) during the shutdown period.
> 
> 

home help back first fref pref prev next nref lref last post