Bldg. 54 - All Normal Power Shutdown Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Dec 11 07:19:22 2001

Message-ID: <568F0AEE7A57D511923900508B55645115607A@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'shutdowns@mit.edu'" <shutdowns@mit.edu>
Date: Tue, 11 Dec 2001 07:19:15 -0500
MIME-Version: 1.0
Content-Type: text/plain

> To: 	shutdowns@mit.edu
> Cc: 	
> Subject: 	Bldg. 54 - All Normal Power Shutdown Request
> 
> 
The following all normal power shutdown request (1st of two shutdowns) for
Bldg. 54 on Thursday, 12/27 PM - Friday, 12/28 AM is for your review and
comment.  Would you please let me know whether this does or does not have
your approval.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872 


> Status: Normal
> Building: 54
> Date: 12/27/2000
> Day: Thursday
> Time: 11 PM (12/27) - 6 AM (12/28)
> System: Normal Power
> Duration: 7 hours
> Reason: 
> To replace high voltage switches.
> 
> Effect: 
> Loss of Power:  access controls, building power, computers, lighting;
> Water:  hot domestic water (for bathroom, kitchen, lab sink faucets), cold
> domestic water (for toilets, bathroom and kitchen sink faucets); Air:
> supply ventilation (from outside), supply cooling, exhaust-laboratory,
> exhaust-general and exhaust-toilet air;  and Steam; condensate return.
> 
> 