[56785] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Cambridge Water Supply Follow-up

daemon@ATHENA.MIT.EDU (Roger Moore)
Tue Oct 9 13:49:13 2001

Message-Id: <200110091746.NAA10119@melbourne-city-street.mit.edu>
Date: Tue, 09 Oct 2001 13:46:01 -0400
To: Plant-notify@MIT.EDU
From: Roger Moore <rmoore@MIT.EDU>
Cc: PLCooper@MIT.EDU
Mime-Version: 1.0
Content-Type: text/plain; charset="us-ascii"

Many have had concerns and have asked questions regarding the City of
Cambridge
water supply. The following is the information we have to date: 
    * The new water treatment plant came on line this past spring after two
    years in construction. For the two year construction period all customers
    of the city water department were receiving MWRA water. This is the same
    water we are now receiving and will be receiving until the plant is
    restarted. 
    * The plant shut down was caused by a power surge originating in the
utility
    power grid. As a result, equipment malfunctioned and water backed down the
    pipe from the reservoir flooding the plant. 
    * The City switched to the MWRA system water that was previously used
during
    construction and is from the same source millions of Massachusetts
    residents are currently using and have been using for years. 
    * It is expected that the plant will be out of service for at least two
    weeks. 
    * The City has assured us that the water is safe for consumption. 
    * All City Water Department customers are receiving the same water. 

If additional information becomes available it will be sent out.





home help back first fref pref prev next nref lref last post