Re: E19 - Air Handler 7-1 - Return Fan Shutdown Request

daemon@ATHENA.MIT.EDU (Stefano Falconi)
Thu Sep 6 17:25:36 2001

Message-Id: <5.0.2.1.2.20010906171942.00ac16a0@hesiod>
Date: Thu, 06 Sep 2001 17:25:12 -0400
To: Andrea Nichols <andrea@PLANT.MIT.EDU>, "'bengel@mit.edu'" <bengel@MIT.EDU>,
        "'cschultz@mit.edu'" <cschultz@MIT.EDU>,
        "'dcairns@mit.edu'" <dcairns@MIT.EDU>,
        "'dlking@mit.edu'" <dlking@MIT.EDU>, "'dshea@mit.edu'" <dshea@MIT.EDU>,
        "'dturn@mit.edu'" <dturn@MIT.EDU>, E-Zone <E-Zone@MIT.EDU>,
        "'e19site@mit.edu'" <e19site@MIT.EDU>,
        "'elsagt@mit.edu'" <elsagt@MIT.EDU>, "'esico@mit.edu'" <esico@MIT.EDU>,
        "'hallisey@mit.edu'" <hallisey@MIT.EDU>,
        "'honiker@mit.edu'" <honiker@MIT.EDU>,
        "'joconor@mit.edu'" <joconor@MIT.EDU>,
        "'kelley@mit.edu'" <kelley@MIT.EDU>,
        "'kshooter@mit.edu'" <kshooter@MIT.EDU>,
        "'lambert@mitvma.mit.edu'" <lambert@mitvma.mit.edu>,
        "'mbowers@mit.edu'" <mbowers@MIT.EDU>,
        Michael Sherman <MSherman@PLANT.MIT.EDU>,
        Mary Tobin <mtobin@PLANT.MIT.EDU>,
        "'narbonne@MIT.EDU'" <narbonne@MIT.EDU>,
        "'opsnote@mit.edu'" <opsnote@MIT.EDU>,
        "'rberlin@mit.edu'" <rberlin@MIT.EDU>,
        "'safety@mit.edu'" <safety@MIT.EDU>,
        Steve Miscowski <SMiscows@PLANT.MIT.EDU>,
        "'tdalton@mit.edu'" <tdalton@MIT.EDU>,
        "'tmeehan@mit.edu'" <tmeehan@MIT.EDU>,
        "'wbarrett@mit.edu'" <wbarrett@MIT.EDU>,
        "'wganger@mit.edu'" <wganger@MIT.EDU>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>
From: Stefano Falconi <sfalconi@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
In-Reply-To: <568F0AEE7A57D511923900508B556451155AFB@PLANT.MIT.EDU>
Mime-Version: 1.0
Content-Type: multipart/alternative;
	boundary="=====================_640130==_.ALT"

--=====================_640130==_.ALT
Content-Type: text/plain; charset="us-ascii"; format=flowed

Dear Andrea,
Unfortunately I am once more forced to record my strong opposition to the 
way this repair is scheduled.  Without fresh air supply, our staff simply 
cannot work.  In addition, judging from what happened on the second and 
third floor earlier this week, the repair time estimate is likely to be 
wildly optimistic.  This is our busy season, and the option of giving my 
staff the day off really is not feasible.

So once again I'm forced to voice a request that these repairs be scheduled 
OUTSIDE OF WORK HOURS. you could, for example, schedule the work to start 
at 4pm, which would only impact us for one hour.

Stefano Falconi

At 02:27 PM 9/6/2001 -0400, Andrea Nichols wrote:
> > To:   bengel@mit.edu; cschultz@mit.edu; dcairns@mit.edu; dlking@mit.edu;
> > dshea@mit.edu; dturn@mit.edu; E-Zone; e19site@mit.edu; elsagt@mit.edu;
> > esico@mit.edu; hallisey@mit.edu; honiker@mit.edu; joconor@mit.edu;
> > kelley@mit.edu; kshooter@mit.edu; lambert@mitvma.mit.edu; mbowers@mit.edu;
> > Michael Sherman; Mary Tobin; narbonne@MIT.EDU; opsnote@mit.edu;
> > rberlin@mit.edu; safety@mit.edu; sfalconi@mit.edu; Steve Miscowski;
> > tdalton@mit.edu; tmeehan@mit.edu; wbarrett@mit.edu; wganger@mit.edu;
> > shutdowns@mit.edu
> > Cc:   shutdown@plant.mit.edu
> > Subject:      E19 - Air Handler 7-1 - Return Fan Shutdown Request
> >
> >
>The following Air Handler 7 - 1 Return Fan Shutdown request for Bldg. E19 -
>6th and 7th floors on Wednesday, 9/12 is for your information and comment.
>Would those of you to whom this applies let me know whether this does or
>does not meet with your approval.
>
>Thank you.
>
>Andrea Nichols
>Operations Center
>8-7872
>
> > Status: Normal
> > Building: E19 - 6th and 7th floors
> > Date: 9/12/2001
> > Day: Wednesday
> > Time: 7:30 AM - 3:30 PM
> > System: Air Handler 7-1 - Return Fan - PM#700697
> > Duration: 8 hours
> > Reason:
> > Replace motor.
> >
> > Effect:
> > Loss of Air Handler 7 - 1 Return Fan (supply ventilation only) in Building
> > E19 - 6th and 7th floors during the shutdown period.
> >
> >

--=====================_640130==_.ALT
Content-Type: text/html; charset="us-ascii"

<html>
Dear Andrea,<br>
Unfortunately I am once more forced to record my strong opposition to the
way this repair is scheduled.&nbsp; Without fresh air supply, our staff
simply cannot work.&nbsp; In addition, judging from what happened on the
second and third floor earlier this week, the repair time estimate is
likely to be wildly optimistic.&nbsp; This is our busy season, and the
option of giving my staff the day off really is not feasible.<br>
<br>
So once again I'm forced to voice a request that these repairs be
scheduled <b>OUTSIDE OF WORK HOURS</b><u>.</u> you could, for example,
schedule the work to start at 4pm, which would only impact us for one
hour.<br>
<br>
Stefano Falconi<br>
<br>
At 02:27 PM 9/6/2001 -0400, Andrea Nichols wrote:<br>
<blockquote type=cite class=cite cite>&gt; To:
<x-tab>&nbsp;&nbsp;</x-tab>bengel@mit.edu; cschultz@mit.edu;
dcairns@mit.edu; dlking@mit.edu;<br>
&gt; dshea@mit.edu; dturn@mit.edu; E-Zone; e19site@mit.edu;
elsagt@mit.edu;<br>
&gt; esico@mit.edu; hallisey@mit.edu; honiker@mit.edu;
joconor@mit.edu;<br>
&gt; kelley@mit.edu; kshooter@mit.edu; lambert@mitvma.mit.edu;
mbowers@mit.edu;<br>
&gt; Michael Sherman; Mary Tobin; narbonne@MIT.EDU; 
opsnote@mit.edu;<br>
&gt; rberlin@mit.edu; safety@mit.edu; sfalconi@mit.edu; Steve
Miscowski;<br>
&gt; tdalton@mit.edu; tmeehan@mit.edu; wbarrett@mit.edu;
wganger@mit.edu;<br>
&gt; shutdowns@mit.edu<br>
&gt; Cc: <x-tab>&nbsp;&nbsp;</x-tab>shutdown@plant.mit.edu<br>
&gt; Subject: <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>E19 - Air
Handler 7-1 - Return Fan Shutdown Request<br>
&gt; <br>
&gt; <br>
The following Air Handler 7 - 1 Return Fan Shutdown request for Bldg. E19
-<br>
6th and 7th floors on Wednesday, 9/12 is for your information and
comment.<br>
Would those of you to whom this applies let me know whether this does
or<br>
does not meet with your approval.<br>
<br>
Thank you.<br>
<br>
Andrea Nichols<br>
Operations Center<br>
8-7872<br>
<br>
&gt; Status: Normal<br>
&gt; Building: E19 - 6th and 7th floors<br>
&gt; Date: 9/12/2001<br>
&gt; Day: Wednesday<br>
&gt; Time: 7:30 AM - 3:30 PM<br>
&gt; System: Air Handler 7-1 - Return Fan - PM#700697<br>
&gt; Duration: 8 hours<br>
&gt; Reason: <br>
&gt; Replace motor.<br>
&gt; <br>
&gt; Effect: <br>
&gt; Loss of Air Handler 7 - 1 Return Fan (supply ventilation only) in
Building<br>
&gt; E19 - 6th and 7th floors during the shutdown period.<br>
&gt; <br>
&gt; </blockquote></html>

--=====================_640130==_.ALT--


home help back first fref pref prev next nref lref last post