[56267] in Hotline Meeting
Re: NW17 - Critical Hot Water Shutdown Request
daemon@ATHENA.MIT.EDU (David Shoemaker)
Thu Sep 6 10:34:28 2001
Message-Id: <5.1.0.14.2.20010906102848.02240b38@18.120.0.82>
Date: Thu, 06 Sep 2001 10:33:21 -0400
To: Andrea Nichols <andrea@plant.mit.edu>,
"'benford@space.mit.edu'" <benford@space.mit.edu>,
D-Zone <D-Zone@MIT.Edu>, "'dhs@tristan.mit.edu'" <dhs@tristan.mit.edu>,
"'fulton@psfc.mit.edu'" <fulton@psfc.mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
From: David Shoemaker <dhs@ligo.mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
Mike Zucker <mike@ligo.mit.edu>, Myron MacInnis <myron@ligo.mit.edu>
In-Reply-To: <568F0AEE7A57D511923900508B556451155AEE@PLANT.MIT.EDU>
Mime-Version: 1.0
Content-Type: multipart/alternative;
boundary="=====================_4193269==_.ALT"
--=====================_4193269==_.ALT
Content-Type: text/plain; charset="us-ascii"; format=flowed
The LIGO Lab (including all the basement labs) has no problem with this
shutdown of hot water.
thanks for the advance notice
David Shoemaker
At 08:38 AM 9/6/2001, Andrea Nichols wrote:
> > To: benford@space.mit.edu; D-Zone; dhs@tristan.mit.edu;
> > fulton@psfc.mit.edu; shutdowns@mit.edu
> > Cc: shutdown@plant.mit.edu
> > Subject: NW17 - Critical Hot Water Shutdown Request
> >
> >
>The following Critical hot domestic and hot lab process water shutdown
>request for Bldg. NW17 on Friday, 9/7 is for your information and comment.
>Would you please let me know whether this does or does not meet with your
>approval.
>
>Thank you.
>
>Andrea Nichols
>Operations Center
>8-7872
>
> > Status: Critical
> > Building: NW17
> > Date: 9/7/2001
> > Day: Friday
> > Time: 7 AM - 3 PM
> > System: Hot Domestic and Lab Process Water
> > Duration: 8 hours
> > Reason:
> > Replace leaking water heater.
> >
> > Effect:
> > Loss of hot domestic water (affects bathroom, kitchen and lab sink
> > faucets) and hot lab process water (affects lab sinks and any equipment
> > requiring this water to operate during the shutdown period.
> >
> >
--=====================_4193269==_.ALT
Content-Type: text/html; charset="us-ascii"
<html>
<font size=3><br><br>
The LIGO Lab (including all the basement labs) has no problem with this
shutdown of hot water. <br><br>
thanks for the advance notice<br><br>
David Shoemaker<br><br>
At 08:38 AM 9/6/2001, Andrea Nichols wrote:<br>
<blockquote type=cite class=cite cite>> To:
<x-tab> </x-tab>benford@space.mit.edu; D-Zone;
dhs@tristan.mit.edu;<br>
> fulton@psfc.mit.edu; shutdowns@mit.edu<br>
> Cc: <x-tab> </x-tab>shutdown@plant.mit.edu<br>
> Subject: <x-tab> </x-tab>NW17 -
Critical Hot Water Shutdown Request<br>
> <br>
> <br>
The following Critical hot domestic and hot lab process water
shutdown<br>
request for Bldg. NW17 on Friday, 9/7 is for your information and
comment.<br>
Would you please let me know whether this does or does not meet with
your<br>
approval.<br><br>
Thank you.<br><br>
Andrea Nichols<br>
Operations Center<br>
8-7872<br><br>
> Status: Critical<br>
> Building: NW17<br>
> Date: 9/7/2001<br>
> Day: Friday<br>
> Time: 7 AM - 3 PM<br>
> System: Hot Domestic and Lab Process Water<br>
> Duration: 8 hours<br>
> Reason: <br>
> Replace leaking water heater.<br>
> <br>
> Effect: <br>
> Loss of hot domestic water (affects bathroom, kitchen and lab
sink<br>
> faucets) and hot lab process water (affects lab sinks and any
equipment<br>
> requiring this water to operate during the shutdown period.<br>
> <br>
> </font></blockquote><br>
</html>
--=====================_4193269==_.ALT--