Bldg. 66 - Chilled Water /Cold Lab Process Water Shutdown Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Aug 30 11:03:46 2001

Message-ID: <568F0AEE7A57D511923900508B556451155A8A@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'kkgleasn@mit.edu'" <kkgleasn@mit.edu>,
        "'patsys@mit.edu'"
	 <patsys@mit.edu>,
        "'schedule@mit.edu'" <schedule@mit.edu>,
        "'swetzel@mit.edu'" <swetzel@mit.edu>,
        "'shutdowns@mit.edu'"
	 <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Thu, 30 Aug 2001 11:01:10 -0400
MIME-Version: 1.0
Content-Type: text/plain

> To: 	kkgleasn@mit.edu; patsys@mit.edu; schedule@mit.edu; swetzel@mit.edu;
> shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 66 - Chilled Water /Cold Lab Process Water Shutdown
> Request
> 
> 
The following chilled water/cold lab process water shutdown request for
Bldg. 66 on Friday, 9/7 PM to Saturday, 9/8 PM is for your information.
Would you please let me know whether this does or does not meet with your
approval.

Thank you.

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building: 66 - all rooms/labs
> Date: 9/7/2001
> Day: Friday
> Time: 3 PM (9/7) - 3 PM (9/8)
> System: Chilled Water pump CV-1 Pmp -2; CV-1 Pmp -2A
> Duration: 24 hours
> Reason: 
> Relocate processed chilled water pumps.
> 
> Effect: 
> Loss of chilled water/cold lab process water in Bldg. 66 during the
> 24-hour shutdown period.  
> 
> 