[55825] in Hotline Meeting
FW: Emergency Power 0utage - UPDATE
daemon@ATHENA.MIT.EDU (Mary Tobin)
Thu Aug 2 11:13:47 2001
Message-ID: <568F0AEE7A57D511923900508B55645113FF43@PLANT.MIT.EDU>
From: Mary Tobin <mtobin@PLANT.MIT.EDU>
To: "'plant-notify@mit.edu'" <plant-notify@mit.edu>
Date: Thu, 2 Aug 2001 11:09:26 -0400
MIME-Version: 1.0
Content-Type: multipart/alternative;
boundary="----_=_NextPart_001_01C11B65.1EB4D960"
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C11B65.1EB4D960
Content-Type: text/plain;
charset="iso-8859-1"
Emergency power has been rerouted to normal power in all areas
affected by this outage. Repair and Maintenance is investigating the cause
to determine what is needed to provide permanent repairs to emergency power.
Mary Tobin
Supervisor/Coach
Repair and Maintenance
Department of Facilities
-----Original Message-----
From: Mary Tobin [mailto:mtobin@PLANT.MIT.EDU]
Sent: Thursday, August 02, 2001 7:29 AM
To: 'plant-notify@mit.edu'
Subject: Emergency Power 0utage
Approximately 6pm last evening, a contractor cored a hole through a
single phase electrical duct in the floor of 4-215, which caused emergency
power outages in buildings 1, 3, 5, 7, 10 and 11. Normal power was not
affected, however, emergency power will be out indefinitely. As a result,
telephones, elevators, fire protection and some emergency lights are still
out. Repair and Maintenance is currently working on transferring these
services to normal power temporarily while the repairs to the emergency
feeder are being made. There may be noise resulting from this work, which
we will try to minimize as much as possible
As the situation develops, we will provide further updates. We
apologize for the inconvenience this outage has caused.
If you have any questions, please contact Paul Stordy through the
central repair line, FIXIT (x3-4948)
Sincerely,
Mary Tobin
Supervisor/Coach
Repair and Maintenance
Department of Facilities
------_=_NextPart_001_01C11B65.1EB4D960
Content-Type: text/html;
charset="iso-8859-1"
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META HTTP-EQUIV="Content-Type" CONTENT="text/html; charset=iso-8859-1">
<META content="MSHTML 5.00.2919.6307" name=GENERATOR></HEAD>
<BODY>
<DIV><FONT color=#0000ff face=Arial size=2><SPAN
class=148370415-02082001> Emergency
power has been rerouted to normal power in all areas affected by this
outage. Repair and Maintenance is investigating the cause to determine
what is needed to provide permanent repairs to emergency
power.</SPAN></FONT></DIV>
<DIV><FONT color=#0000ff face=Arial size=2><SPAN
class=148370415-02082001></SPAN></FONT> </DIV>
<DIV><FONT color=#0000ff face=Arial size=2><SPAN class=148370415-02082001>
<DIV>
<DIV><EM><FONT face=Arial size=2><SPAN class=111104612-08052000>Mary
Tobin</SPAN></FONT></EM></DIV>
<DIV><EM><FONT face=Arial size=2><SPAN
class=111104612-08052000>Supervisor/Coach</SPAN></FONT></EM></DIV>
<DIV><EM><FONT face=Arial size=2><SPAN class=111104612-08052000>Repair and
Maintenance</SPAN></FONT></EM></DIV>
<DIV><FONT face=Arial size=2><SPAN class=111104612-08052000><EM>Department of
Facilities</EM></SPAN></FONT></DIV></DIV></SPAN></FONT></DIV>
<DIV align=left class=OutlookMessageHeader dir=ltr><FONT face=Tahoma
size=2>-----Original Message-----<BR><B>From:</B> Mary Tobin
[mailto:mtobin@PLANT.MIT.EDU]<BR><B>Sent:</B> Thursday, August 02, 2001 7:29
AM<BR><B>To:</B> 'plant-notify@mit.edu'<BR><B>Subject:</B> Emergency Power
0utage<BR><BR></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN
class=132572610-02082001>
Approximately 6pm last evening, a contractor cored a hole through a single phase
electrical duct in the floor of 4-215, which caused emergency power outages in
buildings 1, 3, 5, 7, 10 and 11. Normal power was not <SPAN
class=148370415-02082001><FONT color=#0000ff>a</FONT></SPAN>ffected, however,
emergency power will be out indefinitely. As a result, telephones,
elevators, fire protection and some emergency lights are still out. Repair
and Maintenance is currently working on transferring these services to normal
power temporarily while the repairs to the emergency feeder are being
made. There may be noise resulting from this work, which we will try to
minimize as much as possible </SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN
class=132572610-02082001></SPAN></FONT> </DIV>
<DIV><FONT face=Arial size=2><SPAN
class=132572610-02082001> As the situation develops, we
will provide further updates. We apologize for the inconvenience this
out<SPAN class=148370415-02082001><FONT color=#0000ff>age </FONT></SPAN>
has caused.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN class=132572610-02082001>
</SPAN></FONT><FONT face=Arial size=2><SPAN
class=132572610-02082001></SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN class=132572610-02082001>
If you have any questions, please contact Paul Stordy through the central repair
line, FIXIT (x3-4948)</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN
class=132572610-02082001></SPAN></FONT> </DIV>
<DIV><FONT face=Arial size=2><SPAN
class=132572610-02082001>Sincerely, </SPAN></FONT></DIV>
<DIV>
<DIV><EM><FONT face=Arial size=2><SPAN class=111104612-08052000>Mary
Tobin</SPAN></FONT></EM></DIV>
<DIV><EM><FONT face=Arial size=2><SPAN
class=111104612-08052000>Supervisor/Coach</SPAN></FONT></EM></DIV>
<DIV><EM><FONT face=Arial size=2><SPAN class=111104612-08052000>Repair and
Maintenance</SPAN></FONT></EM></DIV>
<DIV><FONT face=Arial size=2><SPAN class=111104612-08052000><EM>Department of
Facilities</EM></SPAN></FONT></DIV></DIV>
<DIV> </DIV></BODY></HTML>
------_=_NextPart_001_01C11B65.1EB4D960--