[55711] in Hotline Meeting
Bldg. E56 Critical Building Power Shutdown
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Jul 23 11:25:40 2001
Message-ID: <568F0AEE7A57D511923900508B55645115583F@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: E-Zone <E-Zone@MIT.Edu>, "'dempseyr@mit.edu'" <dempseyr@MIT.Edu>,
"'esimha@mit.edu'" <esimha@MIT.Edu>, "'gwj@mit.edu'" <gwj@MIT.Edu>,
"'lhill@mit.edu'" <lhill@MIT.Edu>,
"'mscoppa@mit.edu'" <mscoppa@MIT.Edu>,
"'schedule@mit.edu'" <schedule@MIT.Edu>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Mon, 23 Jul 2001 11:23:52 -0400
MIME-Version: 1.0
Content-Type: text/plain
> To: E-Zone; dempseyr@mit.edu; esimha@mit.edu; gwj@mit.edu;
> lhill@mit.edu; mscoppa@mit.edu; schedule@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. E56 Critical Building Power Shutdown
>
>
The following Critical all building power shutdown request for Bldg. E56 on
Thursday, 7/26 through Friday, 7/27 is for your information and comment.
Would you please let me know whether this does or does not meet with your
approval.
Thank you.
Andrea Nichols
Operations Center
8-7872
> Status: Critical
> Building: E56
> Date: 7/26/2001
> Day: Thursday
> Time: 7 AM (7/26) - 7 AM (7/27)
> System: Building Power
> Duration: 2 hours each day
> Reason:
> NSTAR to replace faulty transformer. Emergency Generator to carry selected
> building loads (everything except elevators).
>
> Effect:
> Loss of access controls; building power, elevators, computers, lighting,
> corridors/stairs; Air: supply ventilation, supply cooling, exhaust-general
> and exhaust-toilet air. These systems will be down from 7 AM - 9 AM on
> Thursday, 7/26 - Emergency Generator will then carry them from 9 AM on
> 7/26 to 5 AM on 7/27 (with the exception of elevators. The systems will
> be back down from 5 AM to 7 AM. At 7 AM all systems will be operational
> for E56.
>
>