Shutdown request for building 2 rooms 205,213, 210 and 214 on 7/6
daemon@ATHENA.MIT.EDU (Dawn Simonelli)
Tue Jul 3 09:55:29 2001
Message-ID: <568F0AEE7A57D511923900508B5564513F4C7A@PLANT.MIT.EDU>
From: Dawn Simonelli <dsimone@PLANT.MIT.EDU>
To: C-Zone <C-Zone@MIT.Edu>, capozzi@math.mit.edu, crg@MIT.Edu,
Cust-Coach
<cust-coach@MIT.Edu>, duggins@math.mit.edu, mbj@MIT.Edu,
rjwilk@MIT.Edu, schedule@MIT.Edu, sdimond@MIT.Edu, shutdowns@MIT.Edu
Cc: shutdown@PLANT.MIT.EDU
Date: Tue, 3 Jul 2001 09:54:12 -0400
MIME-Version: 1.0
Content-Type: text/plain
> To: C-Zone; capozzi@math.mit.edu; crg@mit.edu; Cust-Coach;
> duggins@math.mit.edu; mbj@mit.edu; rjwilk@mit.edu; schedule@mit.edu;
> sdimond@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Shutdown request for building 2 rooms 205,213, 210 and 214
> on 7/6
>
>
The following shutdown request is for building 2 rooms 205, 213, 210, and
214 on 7/6/01. Please let me know if this does or does not meet with your
approval.
Thank you
Dawn Simonelli
Repair and Maintenance
2-1599
> Status: Critical
> Building: 2
> Date: 7/6/01
> Day: Friday
> Time: 6 am - 3 pm
> System: Hot and cold domestic and lab processed water, and lab waste
> drainage.
> Duration: 9 hours
> Reason:
> Removed piping that is coming up through the floor.
>
> Effect:
> There will be a loss of hot and cold domestic water, hot and cold lab
> processed water and lab waste drainage at this time.
>
>