RE: Bldg 9 hhw (perimeter heating) shutdown
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue May 22 13:00:14 2001
Message-ID: <82F0D564C5ADD31180EF00508B556451BD24F8@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: Billy Homeyer <whomeyer@PLANT.MIT.EDU>
Cc: Michael Spezzano <mspezz@PLANT.MIT.EDU>,
George MacDonald
<geomac@PLANT.MIT.EDU>,
Paul Rudack <PRudack@PLANT.MIT.EDU>,
"'westlund@mit.edu'" <westlund@mit.edu>, C-Zone <C-Zone@mit.edu>,
Cust-Coach <cust-coach@mit.edu>, "'deedc@mit.edu'" <deedc@mit.edu>,
"'gallant@mit.edu'" <gallant@mit.edu>,
"'jobrien@mit.edu'"
<jobrien@mit.edu>,
"'kirky@ceci.mit.edu'" <kirky@ceci.mit.edu>,
"'mlavalle@mitvma.mit.edu'" <mlavalle@mitvma.mit.edu>,
"'ndk@mit.edu'"
<ndk@mit.edu>,
"'pam@ceci.mit.edu'" <pam@ceci.mit.edu>,
"'randy@mit.edu'" <randy@mit.edu>, "'sexton@mit.edu'" <sexton@mit.edu>,
"'src@mit.edu'" <src@mit.edu>, Warren Scott <WScott@PLANT.MIT.EDU>,
"'jcollins@mit.edu'" <jcollins@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
"'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Tue, 22 May 2001 13:00:07 -0400
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Hi Billy et al;
Thanks for the information. This shutdown was only for floors 5 and 6 and
was readily approved because the occupants of those 2 floors moved
yesterday. I am sending a copy of this to the rest of the occupants of Bldg.
9 for their information since it now involves the entire building. If there
is a concern about this, please let us know and thanks.
Andrea Nichols
Operations Center
8-7872
> -----Original Message-----
> From: Billy Homeyer
> Sent: Tuesday, May 22, 2001 12:01 PM
> To: Andrea Nichols
> Cc: Michael Spezzano; George MacDonald; Paul Rudack; Meg (E-mail)
> Subject: Bldg 9 hhw (perimeter heating) shutdown
>
> Dear Andrea,
>
> due to complications in the removal of fin tube radiation
> piping on the 5th and 6th
> floors during our secondary heating hot water shutdown scheduled
> today 5/22
> from 7 to 3, we are asking to extend the shutdown through to
> tomorrow at 3pm.
> I have asked and been assured that the hot deck temperature for
> 9-AH1 will be increased
> 7 to 10 degrees over normal operating set points for the duration of
> the extension. This will ensure
> our customers in bldg 9 will have adequate heat to overcome the loss
> of perimeter heat for the next
> 24 hours or so. The continuation of the shutdown should not even be
> noticed.
>
> Very much appreciated, Billy H.