Main Campus Fire Protection Critical Shutdown Including W20, W31,

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri May 18 11:30:11 2001

Message-ID: <82F0D564C5ADD31180EF00508B556451BD24B7@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'capone@mit.edu'" <capone@mit.edu>, "'eisen@mit.edu'" <eisen@mit.edu>,
        "'flett@mit.edu'" <flett@mit.edu>, "'lsc@mit.edu'" <lsc@mit.edu>,
        "'mwf@mit.edu'" <mwf@mit.edu>, "'pwalsh@mit.edu'" <pwalsh@mit.edu>,
        "'rberlin@mit.edu'" <rberlin@mit.edu>,
        "'sdimond@mit.edu'"
	 <sdimond@mit.edu>, "'tej@mit.edu'" <tej@mit.edu>,
        "'wganger@mit.edu'"
	 <wganger@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>,
        "'bwc@mit.edu'" <bwc@mit.edu>, "'bwiget@mit.edu'" <bwiget@mit.edu>,
        D-Zone <D-Zone@mit.edu>, "'djmartin@mit.edu'" <djmartin@mit.edu>,
        "'kenstone@mit.edu'" <kenstone@mit.edu>,
        "'marionoc@mit.edu'"
	 <marionoc@mit.edu>,
        "'pbarratta@mit.edu'" <pbarratta@mit.edu>,
        "'slett@mit.edu'" <slett@mit.edu>, "'safety@mit.edu'" <safety@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Fri, 18 May 2001 11:30:00 -0400
MIME-Version: 1.0
Content-Type: text/plain

> To: 	capone@mit.edu; eisen@mit.edu; flett@mit.edu; lsc@mit.edu;
> mwf@mit.edu; pwalsh@mit.edu; rberlin@mit.edu; sdimond@mit.edu;
> tej@mit.edu; wganger@mit.edu; shutdowns@mit.edu; bwc@mit.edu;
> bwiget@mit.edu; D-Zone; djmartin@mit.edu; kenstone@mit.edu;
> marionoc@mit.edu; pbarratta@mit.edu; slett@mit.edu; safety@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Main Campus Fire Protection Critical Shutdown Including W20,
> W31, W32 and 42
> 
> 
The following Critical shutdown request for the  Main Campus including W20,
W31, W32 and 42 on 5/21 is for your information.  If you have any question
about this, please contact Howard Harrison at 3-6361.

Thank you.

Andre Nichols
Operations Center
8-7872

> Status: Critical
> Building: Main Campus Fire Protection Critical Shutdown Including W20,
> W31, W32 and 42
> Date: 5/21/2001
> Day: Monday
> Time: 7 AM - 4 PM
> System: Main Campus Fire Pump and Bldg. 42 Sprinklers
> Duration: 9 hours
> Reason: 
> To replace leaking and corroded valves on jockey pump.
> 
> Effect: 
> Loss of Main Capus (W20, W31 and W32) fire Pump and Bldg. 42 sprinklers.
> Note: Will switch over to back-up pump located in 39 (500 gpm). The Safety
> Office has been advised of this - that office will notify the Fire
> Department.
> 
> 