Bldgs. E194th and 6th Floors - 5/4 PM to 5/6 PM Asbestos Removal
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Apr 30 13:41:04 2001
Message-ID: <82F0D564C5ADD31180EF00508B556451BD234A@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'cschultz@mit.edu'" <cschultz@mit.edu>,
"'dcairns@mit.edu'"
<dcairns@mit.edu>,
"'dlking@mit.edu'" <dlking@mit.edu>, "'dshea@mit.edu'" <dshea@mit.edu>,
"'dturn@mi.edu'" <dturn@mi.edu>, E-Zone <E-Zone@mit.edu>,
"'e19site@mit.edu'" <e19site@mit.edu>,
"'elsagt@mit.edu'" <elsagt@mit.edu>, "'esico@mit.edu'" <esico@mit.edu>,
"'hallisey@mit.edu'" <hallisey@mit.edu>,
"'honiker@mit.edu'"
<honiker@mit.edu>,
"'joconor@mit.edu'" <joconor@mit.edu>,
"'kelley@mit.edu'" <kelley@mit.edu>,
"'kshooter@mit.edu'"
<kshooter@mit.edu>,
"'lambert@mit.edu'" <lambert@mit.edu>,
"'mbowers@mit.edu'" <mbowers@mit.edu>,
"'narbonne@mit.edu'"
<narbonne@mit.edu>,
"'opsnote@mit.edu'" <opsnote@mit.edu>,
"'rberlin@mit.edu'" <rberlin@mit.edu>,
"'safety@mit.edu'"
<safety@mit.edu>,
"'sfalconi@mit.edu'" <sfalconi@mit.edu>,
"'tdalton@mit.edu'" <tdalton@mit.edu>,
"'tmeehan@mit.edu'"
<tmeehan@mit.edu>,
"'wbarrett@mit.edu'" <wbarrett@mit.edu>,
"'jdoucett@mit.edu'" <jdoucett@mit.edu>,
"'wganger@mit.edu'"
<wganger@mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@mit.edu>,
"'edie@mit.edu'" <edie@mit.edu>,
"'jlrivera@mit.edu'" <jlrivera@mit.edu>,
"'lsanto@mit.edu'" <lsanto@mit.edu>, "'tr6@mit.edu'" <tr6@mit.edu>,
"'tdoyle@mit.edu'" <tdoyle@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
Jim Wallace
<jwallace@PLANT.MIT.EDU>,
Joe Vella <jpvella@PLANT.MIT.EDU>,
Paul Motroni <pmotroni@PLANT.MIT.EDU>,
"'cp-command@mit.edu'"
<cp-command@mit.edu>
Date: Mon, 30 Apr 2001 13:40:50 -0400
MIME-Version: 1.0
Content-Type: text/plain
> To: cschultz@mit.edu; dcairns@mit.edu; dlking@mit.edu; dshea@mit.edu;
> dturn@mi.edu; E-Zone; e19site@mit.edu; elsagt@mit.edu; esico@mit.edu;
> hallisey@mit.edu; honiker@mit.edu; joconor@mit.edu; kelley@mit.edu;
> kshooter@mit.edu; lambert@mit.edu; mbowers@mit.edu; narbonne@mit.edu;
> opsnote@mit.edu; rberlin@mit.edu; safety@mit.edu; sfalconi@mit.edu;
> tdalton@mit.edu; tmeehan@mit.edu; wbarrett@mit.edu; jdoucett@mit.edu;
> wganger@mit.edu; shutdowns@mit.edu; edie@mit.edu; jlrivera@mit.edu;
> lsanto@mit.edu; tr6@mit.edu; tdoyle@mit.edu
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; Jim Wallace; Joe Vella;
> Paul Motroni; cp-command@mit.edu
> Subject: Bldgs. E194th and 6th Floors - 5/4 PM to 5/6 PM Asbestos
> Removal Notification
>
>
This is a confirmation of the asbestos removal notification that was
previously sent to you on 4/13. If you have any questions about this,
please contact Tammy Doyle at 3-5166.
Thank you,
Andrea Nichols
Operations Center
8-7872
> Status: Normal
> Building: E19 - 4th and 6th floors
> Date: 5/4/2001
> Day: Friday
> Time: 4 PM (5/4) - 12 noon (5/6)
> System: None - asbestos removal notification
> Duration: 44 hours
> Reason:
> Remove tiles from E19 - 4th and 6th floor corridors.
>
> Effect:
> Building E19 rooms to be closed the weekend of 5/4 PM, 5/5 and 5/6 are:
> Fourth Floor - rooms 428, 429, 432, 437, 438 and 439 including the
> elevator cove and Sixth Floor - 623, 620, 628, 630, 638, 689, 699 and the
> elevator cove. Please note: The passenger elevators located in E19 Main
> Street Lobby will not be in service. Please use the elevators located in
> E18 or E17 Ames Street Lobby.
>
>