[54449] in Hotline Meeting
Bldg. 26 - 4/2 - All Water Emergency Shutdown
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Mon Apr 2 10:01:00 2001
Message-ID: <82F0D564C5ADD31180EF00508B556451BD2176@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'amcgurl@rle.mit.edu'" <amcgurl@rle.mit.edu>, B-Zone <B-Zone@MIT.Edu>,
Cust-Coach <cust-coach@MIT.Edu>, "'dudley@mit.edu'" <dudley@MIT.Edu>,
"'kates@mit.edu'" <kates@MIT.Edu>,
"'khewitt@mit.edu'" <khewitt@MIT.Edu>,
"'ljtrudel@mit.edu'" <ljtrudel@MIT.Edu>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.Edu>,
"'lsc@mit.edu'" <lsc@MIT.Edu>, "'mhankin@mit.edu'"
<mhankin@MIT.Edu>,
"'nsteele@mit.edu'" <nsteele@MIT.Edu>,
"'safety@mit.edu'" <safety@MIT.Edu>,
"'schedule@mit.edu'"
<schedule@MIT.Edu>,
"'trobins@mit.edu'" <trobins@MIT.Edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@MIT.Edu>
Date: Mon, 2 Apr 2001 10:00:30 -0400
MIME-Version: 1.0
Content-Type: text/plain
> To: amcgurl@rle.mit.edu; B-Zone; Cust-Coach; dudley@mit.edu;
> kates@mit.edu; khewitt@mit.edu; ljtrudel@mit.edu; shutdowns@mit.edu;
> lsc@mit.edu; mhankin@mit.edu; nsteele@mit.edu; safety@mit.edu;
> schedule@mit.edu; trobins@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu
> Subject: Bldg. 26 - 4/2 - All Water Emergency Shutdown
>
>
The following emergency All water shutdown for Bldg. 26 on today, Monday,
4/2 is for your information.
Thank you.
Andrea Nichols
Operations Center
8-7872
> Status: Emergency
> Building: 26
> Date: 4/2/2001
> Day: Monday
> Time: 10:30 AM - 2:30 PM or less
> System: All Water
> Duration: 1 - 4 hours
> Reason:
> Drains are plugged - water backing up in basement.
>
> Effect:
> Loss of all water (hot and cold domestic affects toilets, bathroom and
> kitchen sinks, drinking fountains), hot and cold lab process water (lab
> sinks, safety showers) during the 1-4 hour shutdown period.
>
>