[54430] in Hotline Meeting
Bldg. E17 - Floors 1 -3 - Air Handler 1 Emergency Shutdown
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Mar 30 07:54:18 2001
Message-ID: <82F0D564C5ADD31180EF00508B556451BD2155@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'wardd@mit.edu'" <wardd@mit.edu>,
"'mmahoney@mit.edu'"
<mmahoney@mit.edu>,
Craig Venezia <cvenezia@PLANT.MIT.EDU>, E-Zone
<E-Zone@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
"'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>
Date: Fri, 30 Mar 2001 07:53:55 -0500
MIME-Version: 1.0
Content-Type: text/plain
> To: wardd@mit.edu; mmahoney@mit.edu; Craig Venezia; E-Zone
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; shutdowns@mit.edu
> Subject: Bldg. E17 - Floors 1 -3 - Air Handler 1 Emergency Shutdown
>
>
The following Emergency shutdown for Bldg. E17 (Air Handler 1) on Friday,
3/30 is for your information.
Thank you.
Andrea Nichols
Operations Center
8-7872
> Status: Emergency
> Building: E17 - Floors 1 - 3
> Date: 3/30/2001
> Day: Friday
> Time: 7:10 AM - 7:45 AM or 8:10 AM
> System: Air Handler 1
> Duration: 30 minutes to 1 hour
> Reason:
> Need to replace reheat free stat.
>
> Effect:
> Loss of supply ventilation, supply cooling in E17 - Floor 1 through 3
> during the shutdown epriod.
>
>