[54406] in Hotline Meeting
Bldg. W61 - 4/3 - All Normal Power Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Mar 28 12:01:42 2001
Message-ID: <82F0D564C5ADD31180EF00508B556451BD212E@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'kcn@mit.edu'" <kcn@MIT.EDU>, "'mwhelan@mit.edu'" <mwhelan@MIT.EDU>,
"'rberlin@mit.edu'" <rberlin@MIT.EDU>,
"'wganger@mit.edu'"
<wganger@MIT.EDU>,
"'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
"'opsnote@mit.edu'" <opsnote@MIT.EDU>,
"'gscot@mit.edu'" <gscot@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Wed, 28 Mar 2001 12:01:02 -0500
MIME-Version: 1.0
Content-Type: text/plain
> To: kcn@mit.edu; mwhelan@mit.edu; rberlin@mit.edu; wganger@mit.edu;
> shutdowns@mit.edu; opsnote@mit.edu; gscot@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. W61 - 4/3 - All Normal Power Shutdown Request
>
>
The following all normal power shutdown request for Bldg. W61 on Tuesday,
4/3 is for your review. Would you please let me know whether this does or
does not have your approval.
Thank you,
Andrea Nichols
Operations Center
8-7872
> Status: Normal
> Building: W61
> Date: 4/3/2001
> Day: Tuesday
> Time: 9:30 AM - 3:30 PM
> System: All Normal Power
> Duration: 6 hours
> Reason:
> Cut over power to new high voltage G & W switch.
>
> Effect:
> Loss of Power: building power, access controls, computers, lighting
> (corridors/stairs), Water: heating hot water (perimeter heat in building);
> Air: supply ventilation (air from outside); exhaust-general air,
> exhaust-toilet air and compressed control air) during the 6-hour shutdown
> period.
>
>