[54307] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. 13 - 3/26 and 27 - Hot and Cold Domestic and Lab Process Wa

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Mar 20 15:29:08 2001

Message-ID: <82F0D564C5ADD31180EF00508B556451BD208E@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: B-Zone <B-Zone@MIT.Edu>, Cust-Coach <cust-coach@MIT.Edu>,
        "'elk@mit.edu'" <elk@MIT.Edu>, "'mcoleman@mit.edu'" <mcoleman@MIT.Edu>,
        "'schedule@mit.edu'" <schedule@MIT.Edu>, "'src@mit.edu'" <src@MIT.Edu>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.Edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>
Date: Tue, 20 Mar 2001 15:28:56 -0500
MIME-Version: 1.0
Content-Type: text/plain

> To: 	B-Zone; Cust-Coach; elk@mit.edu; mcoleman@mit.edu; schedule@mit.edu;
> src@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 13 - 3/26 and 27 - Hot and Cold Domestic and Lab
> Process Water, De-ionized Water and Compressed Air Shutdown Request
> 
> 
The following hot and cold domestic and lab process water, de-ionized water
and compressed air shutdown request for Bldg. 13 (see room listing below) on
Monday, 3/26 and Tuesday, 3/27 is for your information and comment.

Would you please let me know whether this does or does not meet with your
approval.

Thank you.

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building: 13 - 2100, 2099A, 2099B, 2111, 2112, 2119, 2119A, 2128B, 2128C,
> 3100, 3099, 311, 3112, 3119, 3120, 4099, 4100, 4111, 4112, 4119, 4119A,
> 4120, 5104, 5099, 51111, 5108, 5119 and 5120
> Date: 3/26/2001
> Day: Monday
> Time: 7 AM (3/26) - 3 PM (3/27)
> System: Hot and cold domestic and lab process water; de-ionized water;
> compressed lab air
> Duration: 2 days
> Reason: 
> Install valves.
> 
> Effect: 
> Loss of hot and cold domestic water (affects toilets, bathroom and kitchen
> sinks, drinking fountains) hot and cold lab process water (affects lab
> sink faucets, emergency showers, equipment requiring use of lab process
> water; no de-ionized water; no compressed lab air (for labs only) will be
> operating during this 2-day shutdown period.
> 
> 

home help back first fref pref prev next nref lref last post