[53231] in Hotline Meeting
Builidng 18 shutdown request for 1/22/01
daemon@ATHENA.MIT.EDU (Dawn Simonelli)
Fri Dec 22 07:47:17 2000
Message-Id: <82F0D564C5ADD31180EF00508B556451D2B6E3@PLANT.MIT.EDU>
From: Dawn Simonelli <dsimone@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.EDU>, akelsey@MIT.EDU,
Cust-Coach
<cust-coach@MIT.EDU>, mbj@MIT.EDU,
"schedule@mit.edu" <rjwilk@mit.eduL>, shutdowns@MIT.EDU
Cc: shutdown@plant.mit.edu
Date: Fri, 22 Dec 2000 07:47:05 -0500
Mime-Version: 1.0
Content-Type: text/plain
> To: A-Zone; akelsey@mit.edu; Cust-Coach; mbj@mit.edu; schedule@mit.edu;
> shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Builidng 18 shutdown request for 1/22/01
>
>
The following shutdown request for builidng 18 is for building 18. This is
for all of the builidng power. Please let me know if this does or does meet
with your approval.
Thank you
Dawn Simonelli
Repair and Maintenance
2-1599
> Status: Normal
> Building: 18 Entire building
> Date: 1/11/01
> Day: Thursday
> Time: 3:00 pm - 6 am
> System: All builidng power & lights for the building (except for emergency
> system)
> Duration: 16 hours
> Reason:
> To replace 13,800 volt feeders and remove first switchboard.
>
> Effect:
> There will be no access controls, no building power, no elevators,
> computers, telephones, or lights. The water systems that will be down
> are chilled water, condenser water, pure water, hot and cold domestic, hot
> and cold lab processed, heating water, and de-ionized. The supply
> ventilation air, supply cooling air, supply heating, exhaust-laboratory
> air. exhaust general air, exhaust toilet, compressed control air,
> compressed lab air and lab vacuum air. Also the condensate return steam
> and exhaust hoods will be down.
>
>