Bldg. E56 - 8/31 PM - 9/1 AM - Normal Power Shutdown Request
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Aug 24 14:45:01 2000
Message-Id: <82F0D564C5ADD31180EF00508B55645110523E@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'esimha@mit.edu'" <esimha@MIT.EDU>, "'gwj@mit.edu'" <gwj@MIT.EDU>,
"'lhill@mit.edu'" <lhill@MIT.EDU>,
"'mscoppa@mit.edu'" <mscoppa@MIT.EDU>,
"'schedule@mit.edu'" <schedule@MIT.EDU>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.EDU>,
"'opsnote@mit.edu'" <opsnote@MIT.EDU>,
"'dempseyr@mit.edu'" <dempseyr@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Thu, 24 Aug 2000 14:43:22 -0400
Mime-Version: 1.0
Content-Type: text/plain
> To: esimha@mit.edu; gwj@mit.edu; lhill@mit.edu; mscoppa@mit.edu;
> schedule@mit.edu; shutdowns@mit.edu; opsnote@mit.edu; dempseyr@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. E56 - 8/31 PM - 9/1 AM - Normal Power Shutdown Request
>
>
The following normal power shutdown request for Bldg. E56 on Thursday, 8/31
PM to Friday, 9/1 AM is for your information and comment. Would you please
let me know whether this does or does not meet with your approval.
Thank you.
Andrea Nichols
Operations Center
8-7872
> Status: Normal
> Building: E56
> Date: 8/31/01
> Day: Thursday
> Time: 6 PM (8/31) - 6 AM (9/1)
> System: Normal power -some load will be picked up on a temporary generator
>
> Duration: 12 hours
> Reason:
> Cambridge Electric needs to change building transformer cable.
>
> Effect:
> Loss of access controls, building power, elevators, computers, telephones,
> lighting, corridors/stairs: Air: supply ventilation (fresh air from
> outside) and supply cooling.
>
>