[48509] in Hotline Meeting
Bldgs. 17, 31, 33, 35 and 41- 9/23 PM - 9/24 AM - Normal Electric
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Sep 17 10:24:47 1999
Message-Id: <D8716484935DD311A1C30008C75B07F90AD00D@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'pcollymo@mit.edu'" <pcollymo@MIT.EDU>,
"'schedule@mit.edu'"
<schedule@MIT.EDU>,
"'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
"'ndpope@mit.edu'" <ndpope@MIT.EDU>,
"'bcorkum@mit.edu'"
<bcorkum@MIT.EDU>,
"'ameswf@mit.edu'" <ameswf@MIT.EDU>,
"'jfobrian@mit.edu'" <jfobrian@MIT.EDU>,
"'dickp@mit.edu'"
<dickp@MIT.EDU>,
"'davies@mit.edu'" <davies@MIT.EDU>,
"'edorsh@mit.edu'"
<edorsh@MIT.EDU>,
"'gerwent@mit.edu'" <gerwent@MIT.EDU>,
"'stiffler@mit.edu'" <stiffler@MIT.EDU>,
"'emcmill@mit.edu'"
<emcmill@MIT.EDU>,
"'gallant@mit.edu'" <gallant@MIT.EDU>,
"'pmccosco@mit.edu'" <pmccosco@MIT.EDU>,
"'brisson@mit.edu'"
<brisson@MIT.EDU>,
"'delsemil@mit.edu'" <delsemil@MIT.EDU>,
"'opsnote@mit.edu'" <opsnote@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Fri, 17 Sep 1999 10:18:37 -0400
Mime-Version: 1.0
Content-Type: text/plain
> To: pcollymo@mit.edu; schedule@mit.edu; shutdowns@mit.edu;
> ndpope@mit.edu; bcorkum@mit.edu; ameswf@mit.edu; jfobrian@mit.edu;
> dickp@mit.edu; davies@mit.edu; edorsh@mit.edu; gerwent@mit.edu;
> stiffler@mit.edu; emcmill@mit.edu; gallant@mit.edu; pmccosco@mit.edu;
> brisson@mit.edu; delsemil@mit.edu; opsnote@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldgs. 17, 31, 33, 35 and 41- 9/23 PM - 9/24 AM - Normal
> Electrical Power Shutdown Request
>
>
The following shutdown request for Bldgs. 17, 31, 33, 35 and 41on Thursday,
9/23 PM - Friday, 9/24 AM is for your review and comment. Would you please
let me know whether this does or does not meet with your approval.
Thank you very much.
Andrea Nichols
Operations Center
8-7872
> Status: Normal
> Building: Bldgs. 17, 31, 33, 35 and 41
> Date: 9/23/24
> Day: Thursday
> Time: 10 PM (9/23) - 2 AM (9/24)
> System: Normal Electrical Power
> Duration: 4 hours
> Reason:
> 1) Remove high voltage switch for Bldgs. 33/35 project and 2) Live-phase
> new high voltage switch for W13 project although W13 will not be affected.
>
> Effect:
> Loss of normal electrical power: Power: access controls, building power,
> elevators, computers, telephones and lighting; Air: supply ventilation,
> supply cooling, supply heating, exhaust-laboratory, exhaust general and
> exhaust toilet air.
>
>