[47845] in Hotline Meeting
RE: Case 145450: Re: [Andrea Nichols] Bldgs. W20 and W23 - 7/15 P
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Jun 29 07:56:53 1999
Message-Id: <ECFE33C8A3D4D111917900805FBE0000831994@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'hotline@MIT.EDU'" <hotline@MIT.EDU>
Date: Tue, 29 Jun 1999 07:49:05 -0400
Mime-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Hi JJ-
There are 3 electrical shutdowns in all involving Bldg. W20- I will send out
that information today. Neil Tomlinson is the originator of these requests.
Knowing him he probably has already made arrangements for computer sensitive
areas. But I will find out more and get back to you. I have asked Neil to
contact Jonathan. To be continued ...
Andrea
----------
From: hotline@MIT.EDU [SMTP:hotline@MIT.EDU]
Sent: Tuesday, June 29, 1999 7:44 AM
To: Andrea Nichols
Subject: Case 145450: Re: [Andrea Nichols] Bldgs. W20 and W23 -
7/15 PM - 7/16 AM - Electric Power, Steam Shutdown Request
Case 145450 has been recently updated and currently stands as
follows:
-----------
--- Entry: Monday, Jun 28, 1999 5:22 PM -- Email Received --
-----------------------------------
Date: Mon, 28 Jun 1999 17:21:56 EDT
To: Andrea Nichols <andrea@PLANT.MIT.EDU>
From: Jonathon Weiss <jweiss@MIT.EDU>
Cc: shutdowns@MIT.EDU, network@MIT.EDU, ops@MIT.EDU
Subject: Re: [Andrea Nichols] Bldgs. W20 and W23 - 7/15 PM - 7/16 AM
-
Electric Power, Steam Shutdown Request
Hi Andrea,
I had the following message forwarded to me, I'm not sure why it
didn't go directly to the shutdowns list in the first place.
This outage, or really any 12 hour electrical outage in w20 is not
acceptable to us. If the outage is really necessary (I thought they
replaced a lot of the electrical infrastructure in w20 about 4 or 5
years ago) we need to find an alternate way to supply power to at
least the w20-575a computer machine room. I also left you voice
mail
about this, but email is a little easier for me to deal with, at
least
for now.
Jonathon Weiss
jweiss@mit.edu
MIT/IS Athena Server Operations
> Received: from SOUTH-STATION-ANNEX.MIT.EDU by po10.MIT.EDU
(5.61/4.7) id
AA23868; Mon, 28 Jun 99 14:26:51 EDT
> Received: from PLANT.MIT.EDU by MIT.EDU with SMTP
> id AA27197; Mon, 28 Jun 99 14:26:13 EDT
> Received: by PLANT.MIT.EDU with Internet Mail Service (5.5.2448.0)
> id <L4Z7D0Q9>; Mon, 28 Jun 1999 14:19:15 -0400
> Message-Id: <ECFE33C8A3D4D111917900805FBE0000831990@PLANT.MIT.EDU>
> From: Andrea Nichols <andrea@PLANT.MIT.EDU>
> To: "'capone@mit.edu'" <capone@MIT.EDU>, "'eisen@mit.edu'"
<eisen@MIT.EDU>,
> "'flett@mit.edu'" <flett@MIT.EDU>, "'lsc@mit.edu'"
<lsc@MIT.EDU>,
> "'mwf@mit.edu'" <mwf@MIT.EDU>, "'pwalsh@mit.edu'"
<pwalsh@MIT.EDU>,
> "'sdimond@mit.edu'" <sdimond@MIT.EDU>
> Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
> Subject: Bldgs. W20 and W23 - 7/15 PM - 7/16 AM - Electric Power,
Steam Sh
> utdown Request
> Date: Mon, 28 Jun 1999 14:19:11 -0400
> Importance: high
> X-Priority: 1
> Mime-Version: 1.0
> X-Mailer: Internet Mail Service (5.5.2448.0)
> Content-Type: text/plain
>
> > To: capone@mit.edu; eisen@mit.edu; flett@mit.edu;
lsc@mit.edu;
> > mwf@mit.edu; pwalsh@mit.edu; sdimond@mit.edu
> > Cc: shutdown@plant.mit.edu
> > Subject: Bldgs. W20 and W23 - 7/15 PM - 7/16 AM - Electric
Power,
> > Steam Shutdown Request
> >
> >
> The following electric power, steam shutdown request for Bldgs.
W20 and W23
> on 7/15 PM - 7/16 AM is for your information and comment. Would
you please
> let me know whether this does or does not meet with your approval.
>
> Thanks very much.
>
> Andrea Nichols
> Operations Center
> 8-7872
>
> > Status: Normal
> > Building: W20 & W23
> > Date: 7/15/16
> > Day: Thursday
> > Time: 7 PM (7/15) - 7 AM (7/16)
> > System: Electric Power Steam
> > Duration: 12 hours
> > Reason:
> > Replacement of high voltage switches/preventative maintenance
work.
> >
> > Effect:
> > Loss of Power: access controls, building power, elevators,
computers,
> > lighting; Water: hot domestic water (for bathroom & kitchen
faucets);
> > Air: supply ventilation, supply cooling, supply heating;
exhaust-general,
> > exhaust-toilet, compressed control air; Steam: high pressure,
medium
and
> > low pressure as well as condensate return.
> >
> >
--- Entry: Tuesday, Jun 29, 1999 7:44 AM -- jjmorey ---
--- Sent E-Mail (Entire Log) To: andrea@PLANT.MIT.EDU
im assuming this shutdown has been canceled, please let us know
when and if it will be rescheduled.
thanks
jj