[47384] in Hotline Meeting
Bldgs. 50, 51 and 14 - Normal Electrical Power - 5/27 PM - 5/28
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue May 4 14:46:59 1999
Message-Id: <ECFE33C8A3D4D111917900805FBE000070EA61@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'schedule@mit.edu'" <schedule@MIT.EDU>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.EDU>,
"'opsnote@mit.edu'" <opsnote@MIT.EDU>, "'mwf@mit.edu'" <mwf@MIT.EDU>,
"'management@wmbr.mit.edu'"
<management@TURNTABLE.MIT.EDU>,
"'sailing@mit.edu'" <sailing@MIT.EDU>,
"'rdavies@mit.edu'" <rdavies@MIT.EDU>,
"'eisen@mit.edu'" <eisen@MIT.EDU>,
"'jsbanks@mit.edu'" <jsbanks@MIT.EDU>, "'efc@mit.edu'" <efc@MIT.EDU>,
"'kglavash@mit.edu'" <kglavash@MIT.EDU>,
"'nlowe@mit.edu'"
<nlowe@MIT.EDU>,
"'ellertsen@mit.edu'" <ellertsen@MIT.EDU>,
"'mosh@mit.edu'" <mosh@MIT.EDU>, "'susanne@mit.edu'" <susanne@MIT.EDU>,
"'bkdavis@mitvma.mit.edu'" <bkdavis@mitvma.mit.edu>,
"'csnyder@mit.edu'"
<csnyder@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Tue, 4 May 1999 14:41:08 -0400
Mime-Version: 1.0
Content-Type: text/plain
> To: schedule@mit.edu; shutdowns@mit.edu; opsnote@mit.edu;
> mwf@mit.edu; management@wmbr.mit.edu; sailing@mit.edu;
> rdavies@mit.edu; eisen@mit.edu; jsbanks@mit.edu; efc@mit.edu;
> kglavash@mit.edu; nlowe@mit.edu; ellertsen@mit.edu; mosh@mit.edu;
> susanne@mit.edu; bkdavis@mitvma.mit.edu; csnyder@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldgs. 50, 51 and 14 - Normal Electrical Power - 5/27 PM
> - 5/28 AM Shutdown Request - Phase I
>
>
The following shutdown request for Bldgs. 50, 51 and 14 (Normal
Electrical Power on 5/27 PM - 5/28 AM is for your review and comment.
Would you please let me know whether this does or does not meet with
your approval. The shutdown for Bldgs. 50 and 51 would be for 8 hours
and 1 hour for Bldg. 14.
Thank you.
Andrea Nichols
Operations Center
8-7872
> Status: Normal
> Building: 50, 51 and 14
> Date: 5/27/28
> Day: Thursday
> Time: 10 PM (5/27) - 6 AM (5/28)
> System: Normal Electrical Power
> Duration: 8 hours (50, 51) 1 Hour (14)
> Reason:
> High voltage substation replacement.
>
> Effect:
> Loss of Power: building power, elevators, computers and lighting;
> Water: heating hot water pumps; Air: supply ventilation and supply
> heating; Steam: condensate return; Drainage: sanitary
>
>