[46969] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. E18 - 3/26 - Basement & 1st Floor Normal Power Shutdown Req

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Mar 19 13:30:31 1999

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: RM-CarpCon <rm-carpcon@MIT.EDU>, RM-Lock <rm-lock@MIT.EDU>,
        RM-StrcPnt
	 <rm-strcpnt@MIT.EDU>,
        Richard Sirois <RSirois@PLANT.MIT.EDU>,
        Robin Arena <RArena@PLANT.MIT.EDU>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.EDU>,
        "'joanf@mit.edu'" <joanf@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Fri, 19 Mar 1999 13:21:48 -0500

To: 	RM-CarpCon; RM-Lock; RM-StrcPnt; Richard Sirois; Robin Arena;
shutdowns@mit.edu; joanf@mit.edu
Cc: 	shutdown@plant.mit.edu
Subject: 	Bldg. E18 - 3/26 - Basement & 1st Floor Normal Power
Shutdown Request


The following shutdown request for Bldg. E18 - Basement and 1st Floor
affecting Normal Power on 3/26 is for your information and comment.
Would you please let me know whether this does or does not meet with
your approval.

Thanks very much.

Andrea Nichols
Operations Center
8-7872

Status: Normal
Building: E18-Basement and 1st Floor
Date: 3/26/99
Day: Friday
Time: 7 AM - 3 PM
System: Building Power - Normal Electric Panel in Hall #106 - Panel
labeled LEB on E-2 Drawing
Duration: 8 hours
Reason: 
To replace old electric panel with new panel.

Effect: 
Loss of building power  and fire alarm system as follows: Lighting Panel
LB3 which affects: room 032, corridor lighting, steam fitter room,
lights and plugs in rooms 027, 031 and 039, room 043, stair lighting,
room 015, going into room 031, receptacles for rooms 021 and 027 and air
handling unit in room 021.




home help back first fref pref prev next nref lref last post