Please distribute the following announcement as you see fit.

Domestic Water Conservation program

The Utilities Group in the Department of Facilities has kicked off a
campus-wide program to conserve domestic water.  The goal is to conserve
water  resources and  generate savings in payments to the City of
Cambridge Water Department for  water and sewer charges.   For example,
existing flushometer  toilets use an average of 3.74 gallons per flush
in academic buildings.  A fifty percent reduction in water
will be achieved by replacing them with  fixtures that use only 1.6
gallons per flush .  At current water rates, the projected savings in
the first year alone from this program will be $164,394 .  These savings
will increase in subsequent years as water and sewer rates continue to
rise at a minimum of 5% annually.   
		  
Work that   needs to be done...

We have hired Acqualine Resources of Newton,
Massachusetts  to  work with Facilities  Utilities and Zone staff to :
	- replace toilets to flush at 1.6 gallons per flush where
possible
	- retrofit sink faucets with tamper resistant aerators
	- retrofit showers with low flow shower heads where possible
		  
Those bathrooms where work is being done will be temporarily unavailable
for use for 2-3 hours.   In buildings where risers may  need to be shut
off , we will follow standard shutdown request procedures and work will
be scheduled to cause minimal interruption of water service.  
Work has been completed in Buildings E19, E18, E17, E25,E23, E15 and E38
and will continue sequentially through the following list of  academic
buildings in the East , Main and West campus:

E32,E34,E48,E40,E51.E52.E53,E56,E60,68,66,54,56,16,18,2,6,4,8,10,3,5,1,7
,13,11,24,36,31,14,W20,W31,W32,W34,W23,W16,W15 .

We thank you for your co-operation in helping us with water conservation
on campus.
If you have any questions,   please contact  us by sending e-mail to
water-conservation@mit.edu
Laxmi Rao                                    Tel:   (617)253-6821
Sr. Project Manager- Utilities          Fax:   (617) 253-3737
M.I.T. Department of Facilities     e-mail:  lrao@mit.edu

home help back first fref pref prev next nref lref last post