Re: Notification of Bldg 64 power work?

daemon@ATHENA.MIT.EDU (John Hawkinson)
Tue Dec 29 12:39:17 1998

Date: Tue, 29 Dec 1998 12:39:12 -0500 (EST)
To: Andrea Nichols <andrea@PLANT.MIT.EDU>
Cc: shutdowns@MIT.EDU, Camilla Fox <cfox@MIT.EDU>
In-Reply-To: "[3160] in Physical Plant Shutdowns"
From: John Hawkinson <jhawk@MIT.EDU>

| Hi John--
| I'm sorry - I don't  know what you are talking about.

OK, well, that seems like an excellent reason for no notification
from you.

| I didn't have any "power" shutdown notification for Bldg. 64. I'm
| not sure what bathroom "power" is but this didn't come from repair
| and maintenance people.

Sorry, 120VAC utility power to bathrooms.

| Do you have another contact source? If so, please let me know
| ... I'm curious about this too! And ... if I know about is then
| shutdowns@mit.edu (the network people) will know too!  Did you check
| with the housing people? They often have outside contractors do work
| for them.

I haven't pursued vigorously, the attached message was what prompted
me to inquire of you. It certainly implies Facilities is involved ;-)
(Geri-Lyn is House Manager for building 64).

Thanks.

--jhawk

Received: from PACIFIC-CARRIER-ANNEX.MIT.EDU by po10.MIT.EDU (5.61/4.7) id AA20659; Tue, 29 Dec 98 12:02:52 EST
Received: from MIT.MIT.EDU by MIT.EDU with SMTP
	id AA00127; Tue, 29 Dec 98 12:01:31 EST
Received: from EC-HOUSEMANAGER.MIT.EDU by MIT.MIT.EDU (5.61/4.7) id AA06873; Tue, 29 Dec 98 12:01:30 EST
Message-Id: <v03020904b2aeb8455abf@[18.248.0.81]>
In-Reply-To: <199812291622.LAA28692@M66-080-1.mit.edu>
Mime-Version: 1.0
Content-Type: text/plain; charset="us-ascii"
Date: Tue, 29 Dec 1998 12:01:11 -0500
To: Camilla R Fox <cfox@MIT.EDU>
From: Geri-Lyn Bowen <geralou@MIT.EDU>
Subject: Re: today's 18.238 network outage
Cc: ec-discuss@MIT.EDU


Facilities (Physical Plant) is doing work in Bemis basement to make way for
new fire panels.  I was told they would be shutting down the power in Bemis
bathroom outlets only. That's when I sent out the e-mail on 12/17 to the
East Parallel informing the residents of the work.  Well, after the
shutdown they found out that someone had connected the network and cable
system to the bathroom power in Bemis.  Therefore causing the network and
cable to go out in the entire East Parallel.  I've been assured the network
and cable will be back on by the end of the day.

Geri-Lyn


>Apparently they were trying to do improvements to the fire alarm
>system, and accidentally cut the power to the hub (serving the east
>parallel) at about 9:30 this morning.
>
>Rumor is that the ETA is the end of the work day.
>
>It would have been really nice to have some advance notice about that
>sort of work being done.
>
><whine>


Geri-Lyn Bowen
East Campus House Manager
Massachusetts Institute of Technology
3 Ames Street, Cambridge, MA  02142
(617) 253-2863
geralou@mit.edu