Bldg. 48 - All - Electric Power and Lighting Shutdown Request for

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Nov 10 11:10:01 1998

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'frankel@mit.edu'" <frankel@MIT.EDU>,
        "'schedule@mit.edu'"
	 <schedule@MIT.EDU>,
        "'mistetri@mit.edu'" <mistetri@MIT.EDU>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Tue, 10 Nov 1998 10:58:55 -0500

> To: 	frankel@mit.edu; schedule@mit.edu; mistetri@mit.edu;
> shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 48 - All - Electric Power and Lighting Shutdown
> Request for 11/19
> 
> 
The following Electric Power and Lighting shutdown request for Bldg. 48
on 11/19 is for your information and comment.  Would you please let me
know whether or not this has your approval.

Thanks very much.

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building: 48
> Date: 11/19/98
> Day: Thursday
> Time: 5 PM - 5:45 PM
> System: All electric power and lighting
> Duration: 45 minutes
> Reason: 
> To remove temporary cables from electrical switch board.
> 
> Effect: 
> Loss of Power:  access controls, emergency generator, bldg. power,
> elevators, computers, telephones, lighting;  Water - chilled water
> (air conditiong);  Air:  supply ventilation, supply cooling, supply
> heating, exhaust-laboratory, exhaust - general, exhaust - toilet,
> compressed control, compressed lab air and lab vacuum air;  Steam:
> Condensate return only.
> 
> 