[45452] in Hotline Meeting
RE: Bldg. 48 All Electric Power & Lighting Shutdown Request for 1
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue Oct 20 08:17:45 1998
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'sfrankel@mit.edu'" <sfrankel@MIT.EDU>,
"'shutdowns@mit.edu'"
<shutdowns@MIT.EDU>,
"'opsnote@mit.edu'" <opsnote@MIT.EDU>
Cc: Shutdown <Shutdown@PLANT.MIT.EDU>
Date: Tue, 20 Oct 1998 08:09:11 -0400
Sheila - based upon your conversation with Neil Tomlinson the shutdown
will now be as follows. Would you please confirm that this shutdown has
your approval at your earliest convenience.
Athena and Opsnote - please note changes in times.
Thanks very much.
> Andrea Nichols
> Operations Center
> 8-7872
>
> > Status: Normal
> > Building: 48
> > Date: 10/22/98
> > Day: Thursday
> > Time: 5:00 PM - 12 midnight
> > System: All Electric Power and lighting
> > Duration: 7 hours
> > Reason:
> > To test new transfer switch and install final wiring
> connections.
> >
> > Effect:
> > Loss of Power: access controls, emergency generator emergency
> power,
> > bldg. power, elevators, computers, telephones, lighting,
> > corridors/stairs, water: chilled water (air conditioning),
> heating
> > hot water (heat); Air: supply ventilation, supply cooling,
> supply
> > heating, exhaust laboratory, exhaust general exhaust toilet
> air,
> > compressed control air, compressed lab air, lab vacuum air.
> One half
> > hour (from 5 - 5:30 PM) total outage of building to disconnect
> > from generator in parking lot.
> > Followed by short duration of intermittent outages (from 5:30
> PM - 7:00 PM) to test
> > starting and transfer of new equipment. From 7 PM until finish
> there will be no more outages. Will finish no later than
> > midnight.
> >
> >
>
>