Bldgs. 16 and 56 7th Floor Emergency Power Shutdown Request for 1

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Oct 7 11:17:51 1998

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'mparker@mit.edu'" <mparker@MIT.EDU>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Wed, 7 Oct 1998 11:09:52 -0400

> To: 	mparker@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldgs. 16 and 56 7th Floor Emergency Power Shutdown
> Request for 10/20
> 
> 
The following shutdown request for Bldgs. 16 and 56 (Emergency Power) on
10/20 is for your information and comment. Would you please let me know
whether this has your approval or does not. 

Thanks Marshall.

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building: 16 and 56 - 7th floor only
> Date: 10/20/98
> Day: Tuesday
> Time: 7:00 AM - 9:00 AM
> System: Emergency Power
> Duration: 2 hours
> Reason: 
> To change tops on transformers
> 
> Effect: 
> Loss of emergency power: elevators and lighting (corridors and
> stairs). Air in these buildings will be affected as follows:
>  HVAC Controls:
> Offices: 
> Heating, cooling and ventilation devices (valves and dampers) will
> remain in their last commanded position (ie; if heat or cooling is on
> it will stay on, if off it will stay off, ventilation levels will stay
> the same).
> 
> All other spaces, including labs and corridors:
> Heating valves will go on full, cooling valves will go off, hood
> exhaust and make-up will stay at their last commanded position.  We
> will be able to minimize the impact of full heat by lowering the
> heating water temperature as required.
> 
> 
> 