[45049] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. W16 - All Building Systems Shutdown Request for 10/7

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Sep 23 09:53:32 1998

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'mwf@mit.edu'" <mwf@MIT.EDU>, "'mdimauro@mit.edu'" <mdimauro@MIT.EDU>,
        "'diegom@mit.edu'" <diegom@MIT.EDU>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Wed, 23 Sep 1998 09:23:37 -0400

> To: 	mwf@mit.edu; mdimauro@mit.edu; diegom@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. W16 - All Building Systems Shutdown Request for
> 10/7
> 
> 
The following shutdown request for Bldg. W16 - All Building Systems - on
10/7 is for your information and comment. Would you please let me know
if this meets with your approval or does not.

Thanks very much.

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building: W16
> Date: 10/7/98
> Day: Wednesday
> Time: 6:00 AM - 11:00 AM
> System: Electrical power/steam
> Duration: 5 hours
> Reason: 
> Installation of electric meter -* steam shutdown required.
> 
> Effect: 
> Loss of Power: access controls, bldg. power, computers, lighting;
> Water: chilled water (air conditioning); hot domestic water (no water
> in bathroom and/or kitchen faucets), heating hot water (no heat);
> Air:  supply ventilation, supply cooling, supply heatng, exhaust
> laboratory air, exhaust general air, exhaust toilet air, compressed
> control air;  Steam:  condensate return;  Drainage:  sanitary and
> storm drain.
> 
> 

home help back first fref pref prev next nref lref last post