Re: Rescheduled W20-204 thru 206 and 316 thru 326 Shutdown Request fo r 8/25
daemon@ATHENA.MIT.EDU (Jonathon Weiss)
Thu Aug 20 18:05:33 1998
From: Jonathon Weiss <jweiss@MIT.EDU>
To: Andrea Nichols <andrea@PLANT.MIT.EDU>
Cc: "'mwf@mit.edu'" <mwf@MIT.EDU>, "'pdc@mit.edu'" <pdc@MIT.EDU>,
"'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
"'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>, ops@MIT.EDU
In-Reply-To: Your message of "Thu, 20 Aug 1998 11:05:34 EDT."
<ECFE33C8A3D4D111917900805FBE00001FD6BD@PLANT.MIT.EDU>
Date: Thu, 20 Aug 1998 18:05:24 EDT
Assuming it has been double checked that this won't affect rooms on
the 5th floor, I don't have a problem wiht it. On the other hand, I
was under the impression that the outage that was attempted the other
night wasn't scheduled to affect the large units in 575a either.
Also, could you tell me why that shutdown wasn't announced to the
shutdowns@mit.edu mailing list?
Jonathon
> The following revised shutdown for Bldg. W20 - 204 thru 206 and 316 thru
> 326 on 8/25 is for your information and comment. This shutdown applies
> to the above listed rooms only - this will not affect Athena and the
> entire building does not have to be drained down. Kevin Connolly would
> like to do this work during the day if at all possible.
>
> Would you please let me know if this meets with your approval or not.
>
> Thanks very much.
>
> Andrea Nichols
> Operations Center
> 8-7872
>
> > Status: Normal
> > Building: W20-204 thru 206 & 316 thru 326
> > Date: 8/25/98
> > Day: Tuesday
> > Time: 7:00 AM - 11:00 AM
> > System: Chilled Water
> > Duration: 4 hours
> > Reason:
> > Repair leak on pipe in main computer cell.
> >
> > Effect:
> > Loss of chilled water (air conditioning) in the above listed rooms
> > (networks, Toscanini's, Lobdell Dining Hall and 3rd Floor Southeast.