[44560] in Hotline Meeting
RE: Revised -Bldgs. 5, 7, E52, E53 and E55 All Normal Electric Po
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Aug 19 09:00:23 1998
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'schedule@mit.edu'" <schedule@MIT.EDU>,
"'mgibson@mit.edu'"
<mgibson@MIT.EDU>,
"'pmccosco@mit.edu'" <pmccosco@MIT.EDU>,
"'sburke@mit.edu'" <sburke@MIT.EDU>,
"'skendall@mit.edu'"
<skendall@MIT.EDU>,
"'altonero@mit.edu'" <altonero@MIT.EDU>,
"'jsmith@mit.edu'" <jsmith@MIT.EDU>, "'mleen@mit.edu'" <mleen@MIT.EDU>,
"'mamullow@mit.edu'" <mamullow@MIT.EDU>, "'ndk@mit.edu'" <ndk@MIT.EDU>,
"'decarli@mit.edu'" <decarli@MIT.EDU>,
"'patdixon@mit.edu'"
<patdixon@MIT.EDU>,
"'kbarrett@mit.edu'" <kbarrett@MIT.EDU>,
"'rdavies@mit.edu'" <rdavies@MIT.EDU>,
"'cwilkes@mit.edu'"
<cwilkes@MIT.EDU>,
"'rhwill@mit.edu'" <rhwill@MIT.EDU>, "'src@mit.edu'"
<src@MIT.EDU>,
"'jobrien@mit.edu'" <jobrien@MIT.EDU>,
"'engler@mitvma.mit.edu'" <engler@mitvma.mit.edu>,
"'cod@mit.edu'"
<cod@MIT.EDU>, "'lhill@mit.edu'" <lhill@MIT.EDU>,
"'mscoppa@mit.edu'"
<mscoppa@MIT.EDU>,
"'michaela@mit.edu'" <michaela@MIT.EDU>, "'gwj@mit.edu'" <gwj@MIT.EDU>,
"'maureen@mit.edu'" <maureen@MIT.EDU>,
"'jbkalb@mit.edu'" <jbkalb@MIT.EDU>, "'mwf@mit.edu'" <mwf@MIT.EDU>,
"'janets@mit.edu'" <janets@MIT.EDU>,
"'mwhelan@mit.edu'"
<mwhelan@MIT.EDU>,
"'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
"'opsnote@mit.edu'" <opsnote@MIT.EDU>,
"'melanie@mit.edu'"
<melanie@MIT.EDU>,
"'lreinher@mit.edu'" <lreinher@MIT.EDU>
Cc: Shutdown <Shutdown@PLANT.MIT.EDU>
Date: Wed, 19 Aug 1998 08:54:08 -0400
Dear Everyone:
Please note the revisions in the type of services affected section of
this shutdown request for this coming Friday, 8/21. If you have a
concern about this, please let me know by the end of today, if at all
possible.
Thank you for your time and I look foward to hearing from you.
Andrea Nichols
Operations Center
8-7872
> ----------
> The following all normal electric power shutdown request for buildings
> 5, 7, E52, E53 and E55 on 8/21 is for your information and comment.
> Would you please let me know if this has your approval or not.
>
>
> > Status: Normal
> > Building: 5, 7, E52, E53 and E55
> > Date: 8/21/98
> > Day: Friday
> > Time: 5:00 AM - 6:00 AM
> > System: All Normal Electric Power
> > Duration: 1/2 hour between above times
> > Reason:
> > Final loop phase check at power plant.
> >
> > Effect:
> > Loss of power: building, elevators, computers and lighting;
> Buildings
> > will have emergency power. Water: Loss of chilled water (air
> conditioning); Air: Supply ventilation, supply cooling, exhaust
> general, exhaust-toilet, compressed control air; Steam: condensate
> return.
> >
> >
>