FW: Approved Bldg. E55 Electrical Shutdown for 6/11 and 6/12

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Jun 10 09:13:51 1998

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'dcarlson@mit.edu'" <dcarlson@MIT.EDU>,
        "'cappucci@mit.edu'"
	 <cappucci@MIT.EDU>,
        "'jfreeman@mit.edu'" <jfreeman@MIT.EDU>,
        "'mwhelan@mit.edu'" <mwhelan@MIT.EDU>,
        "'wpwohlfa@plant.mit.edu'"
	 <wpwohlfa@plant.mit.edu>,
        Neil Tomlinson <NTomlins@PLANT.MIT.EDU>,
        Manuel Moreira <mmoreira@PLANT.MIT.EDU>, E-Zone <E-Zone@MIT.EDU>,
        James Sullivan <jsulliva@PLANT.MIT.EDU>
Cc: "'shutdonw@plant.mit.edu'" <shutdonw@plant.mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
        RM-Support
	 <RM-Support@MIT.EDU>
Date: Wed, 10 Jun 1998 09:09:48 -0400

The following approved Electrical shutdown for Bldg. E55 on 6/11 and
6/12 is for your information.

Andrea Nichols
Operations Center
8-7872
> > Status: Normal
> > Building: E55
> > Date: 6/11 & 12/98
> > Day: Thursday PM and Friday AM
> > Time: 7:00 PM - 5:00 AM
> > System: Normal electrical power; the Emergency Generator will be ON.
> > Duration: 10 hours
> > Reason: 
> > To upgrade high voltage service - this is first of two shutdowns
> > needed.
> > 
> > Effect: 
> > Loss of all normal electrical power: access controls, building
> power,
> > one elevator will be off; computers, telephones lighting; Water: At
> > the beginning of the shutdown (7:00 PM on 6/11/98 - Thursday
> evening)
> > Physical Plant will tie in temporary power to supply power to the
> > mechanical systems panels so that the City water booster pump and
> > other systems will be running. This will take approximately 30
> minutes
> > to make this connection. For the first 30 minutes there will be
> reduced
> > or no water pressure above the 6th floor. Physical Plant will repeat
> > this procedure at the end of the shutdown (before 5:00 AM on 6/12
> > (Friday) to re-connect the wiring back to normal; Air: supply
> > ventilation, supply cooling, supply heating, exhaust laboratory,
> > exhaust general exhaust toilet air, compressed control air; and
> Steam:
> > condensate return.
> > 
> > 
> 
> 