[42181] in Hotline Meeting
Travels
daemon@ATHENA.MIT.EDU (Louis A. Isgur)
Mon Mar 2 22:08:39 1998
To: hotline@MIT.EDU
Date: Mon, 02 Mar 1998 22:08:35 EST
From: "Louis A. Isgur" <larugsi@MIT.EDU>
W20-575,1-142,1-115,11-112,56-129,12-182,14-0330,4-167,4-035, & 38-370.
Priority Items:
1. There is 1 CSA part going out. RMA # all set. Ready to roll.
2. Have spent time tracking a few parts today. The sgi 5000 cpu should be
arriving today, and have found the missing power supply/simm at pcservice.
Brian has delivered the missing parts from pcservice to the staging room.
Thanks Brian!
3. I have been working with Chris on the M1-142-19 sgi that was displaying
some strange behavior. There were 2 reasons that plagued M1-142-19. The
first was that it had a bad a.c. power cord. The second being that it had
a cpu for a 4600 installed instead of a 5000's cpu, which leads to mention
that it is very important to take parts seriously. When hardware is taken
apart, all screws should be put into zip locked bags, and the proper bds
should be housed in the systems that they come out of (in static bags).
4. I have rebuilt the CSA-02 system, which is now back up and running.
5. Have placed a call to UPS for sgi parts pickup for Tuesday.
6. Have cleared all 1410 hardware related calls.
--Lou