[41323] in Hotline Meeting
FW: Approved - Requested Rescheduled Date for Bldg. 54 - 480 Volt
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jan 2 10:39:37 1998
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'dcarlson@mit.edu'" <dcarlson@MIT.EDU>,
"'cappucci@mit.edu'"
<cappucci@MIT.EDU>,
"'mmahoney@mit.edu'" <mmahoney@MIT.EDU>,
Neil Tomlinson <NTomlins@PLANT.MIT.EDU>,
James Sullivan
<jsulliva@PLANT.MIT.EDU>,
Manuel Moreira <mmoreira@PLANT.MIT.EDU>,
"'sdverify@mit.edu'" <sdverify@MIT.EDU>, A-Zone <A-Zone@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
"'cust-coach@mit.edu'"
<cust-coach@MIT.EDU>,
"'opsnote@mit.edu'" <opsnote@MIT.EDU>
Date: Fri, 2 Jan 1998 10:37:39 -0500
The following approved rescheduled shutdown for Bldg. 54 - 480 volt
electric power on 1/9/98 is for your information.
Andrea Nichols
Operations Center
8-7872
> > Status: Normal
> > Building: 54 ALL
> > Date: 1-9/98
> > Day: Friday
> > Time: 7:00 AM - 8:00 AM
> > System: 480 Volt Electric Power - All Mechanical
> Systems
> > Duration: 1 hour
> > Reason:
> > To install metering equipment at main electrical
> switchgear.
> >
> > Effect:
> > Loss of Power: elevators; Water: chilled water (AC),
> heating hot
> > water; Air: Supply ventilation, supply cooling, supply
> heating,
> > exhaust-laboratory, exhaust-general, exhaust-toilet,
> compressed
> > control, compressed lab air and lab vacuum air; Steam:
> high, medium,
> > low pressure and condensate return
> >
> >
>
>
>
>