FW: Approved - Requested Rescheduled Date for Bldg. 54 - 480 Volt

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jan 2 10:39:37 1998

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'dcarlson@mit.edu'" <dcarlson@MIT.EDU>,
        "'cappucci@mit.edu'"
	 <cappucci@MIT.EDU>,
        "'mmahoney@mit.edu'" <mmahoney@MIT.EDU>,
        Neil Tomlinson <NTomlins@PLANT.MIT.EDU>,
        James Sullivan
	 <jsulliva@PLANT.MIT.EDU>,
        Manuel Moreira <mmoreira@PLANT.MIT.EDU>,
        "'sdverify@mit.edu'" <sdverify@MIT.EDU>, A-Zone <A-Zone@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
        "'cust-coach@mit.edu'"
	 <cust-coach@MIT.EDU>,
        "'opsnote@mit.edu'" <opsnote@MIT.EDU>
Date: Fri, 2 Jan 1998 10:37:39 -0500

The following approved rescheduled shutdown for Bldg. 54 - 480 volt
electric power on 1/9/98 is for your information.

Andrea Nichols
Operations Center
8-7872
> 		> Status: Normal
> 		> Building: 54 ALL 
> 		> Date: 1-9/98
> 		> Day: Friday
> 		> Time: 7:00 AM - 8:00 AM
> 		> System: 480 Volt Electric Power - All Mechanical
> Systems
> 		> Duration: 1 hour
> 		> Reason: 
> 		> To install metering equipment at main electrical
> switchgear.
> 		> 
> 		> Effect: 
> 		> Loss of Power: elevators; Water: chilled water (AC),
> heating hot
> 		> water; Air: Supply ventilation, supply cooling, supply
> heating,
> 		> exhaust-laboratory, exhaust-general, exhaust-toilet,
> compressed
> 		> control, compressed lab air and lab vacuum air; Steam:
> high, medium,
> 		> low pressure and condensate return
> 		> 
> 		> 
> 
> 
> 
> 