FW: Revised Bldg. 6 - Certain Rooms But Affects the Entire Buildi

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Dec 4 10:48:09 1997

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: dcarlson@MIT.EDU, cappucci@MIT.EDU, mmahoney@MIT.EDU, cust-coach@MIT.EDU,
        Greg Raposa <graposa@PLANT.MIT.EDU>, sdverify@MIT.EDU,
        C-Zone <C-Zone@MIT.EDU>, farideh@MIT.EDU,
        Peter Podlejski
	 <pgpodlej@PLANT.MIT.EDU>
Cc: shutdown@plant.mit.edu, shutdowns@MIT.EDU
Date: Thu, 4 Dec 1997 10:47:00 -0500

The follwing approved shutdown for Bldg. 6 (see rooms listed below) is
for your information.

Andrea Nichols
Operations Center
8-7872
> > Status: Normal
> > Building: 6 - 030A, 030, 030C, 032, 132, 134, 136A, 136, 222B, 220,
> > 232, 234C, 234B, 332 LAB, 334A, 336 Lab Sv, 432, 434 Lab, 436 Lab
> sv, (but also entire building)
> > Date: 12/06/97
> > Day: Saturday
> > Time: 7:00 AM - 3:00 PM
> > System: Low pressure steam (heating hot water)
> > Duration: 8 hours maximum
> > Reason: 
> > Replace existing control valves at radiators with new thermostatic
> > control valve
> > 
> > Effect: 
> > Loss of perimeter heat in all rooms listed above except Rooms 030A,
> > 030, 030C, 032, 132, 134 and 136. There will be no heat in these
> rooms.
> > 
> > 
> 
> 