Bldg. 50 and 51 Shutdown Request on 11/18

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Nov 13 13:24:53 1997

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: schedule@MIT.EDU, shutdowns@MIT.EDU, eisen@it.edu, mwf@MIT.EDU,
        sailing@MIT.EDU, drhill@MIT.EDU
Cc: shutdown@plant.mit.edu
Date: Thu, 13 Nov 1997 13:24:19 -0500

> To: 	schedule@mit.edu; shutdowns@mit.edu; eisen@ it.edu; mwf@mit.edu;
> sailing@mit.edu; drhill@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. 50 and 51 Shutdown Request on 11/18
> 
> 
The following shutdown request for Bldgs. 50 and 51 on 11/18 is for your
review and comment. Would you please let me know if this has your
approval or not.

Thanks very much.

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building: 50 and 51
> Date: 11/18/97
> Day: Tuesday
> Time: 6:00 AM - 7:00 AM
> System: Electric lighting and power
> Duration: 1 hour
> Reason: 
> To install metering equipment in main switchgear in transformer room
> 
> Effect: 
> Loss of Power: access controls, building power, elevators, computers,
> telephones and lighting; Water: chilled water; Air: suppply
> ventilation, cooling, heatring, exhaust laboratory, exhaust general,
> exhaust toilet, compressed control, compressed lab air and lab vacuum
> air; Steam: low pressure
> 
> 