Bldg. 18 - All Shutdown request for 11/13
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Nov 6 12:26:59 1997
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: juliec@MIT.EDU, mbj@MIT.EDU, cust-coach@MIT.EDU, opsnote@MIT.EDU,
shutdown@MIT.EDU, schedule@MIT.EDU
Cc: shutdown@plant.mit.edu
Date: Thu, 6 Nov 1997 12:25:31 -0500
> To: juliec@mit.edu; mbj@mit.edu; cust-coach@mit.edu;
> opsnote@mit.edu; shutdown@mit.edu; schedule@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldg. 18 - All Shutdown request for 11/13
>
>
The following shutdown request for Bldg. 18 on 11/13 is for your
information and comment. Would you please let me know if this has your
approval or not.
Thanks very much.
Andrea Nichols
Operations Center
8-7872
> Status: Normal
> Building: 18 (entire bldg.)
> Date: 11/13/97
> Day: Thursday
> Time: 7:00 AM - 8:00 AM
> System: All normal power & lighting
> Duration: 1 hour
> Reason:
> To test and survey emergency lighting and power systems
>
> Effect:
> Loss of bldg. power, elevator, computer, telephones, lighting; chilled
> water (a/c) and hot domestic water (kitchen and bathroom faucets and
> de-ionized water; Loss of supply ventilation, cooling, heating,
> laboratory and general exhaust air, toilet exhaust air, compressed
> control air, compressed lab air, lab vacuum air and low pressure
> steam.
>
>