POWER HIT:
daemon@ATHENA.MIT.EDU (larugsi@ATHENA.MIT.EDU)
Fri May 11 22:40:30 1990
From: larugsi@ATHENA.MIT.EDU
To: hotline@ATHENA.MIT.EDU
Cc: operations@ATHENA.MIT.EDU
Date: Fri, 11 May 90 22:39:44 EDT
A power hit took place on Friday evening around 19:45. The hit seemed to be
contained to the EAST SIDE of Campus. Major bldg's effected were E40, and E51.
The E40 machine room had several machines down, in which Jeff Schiller was
able to revive. This report is still inconclusive but, PARIS is down with
a RA81 fault which will be called in for service on Monday.
Several of the DIAL IN SERVERS are not responding. Anne Salemme will be looking
into this problem. Jeff is currently working on the OLC server.
Every machine, including the print server in E51 had to be rebooted. All came
back except for E51-007-11, which I am currently formatting, and will need
software installed. As stated above, this is just a partial damage report.
--Lou