[38578] in Hotline Meeting
Re: 14S Shutdn
daemon@ATHENA.MIT.EDU (larugsi@MIT.EDU)
Wed Jun 4 13:42:03 1997
From: larugsi@MIT.EDU
To: hotline@MIT.EDU
Cc: bmurphy@MIT.EDU
Date: Wed, 04 Jun 1997 13:42:01 EDT
------- Forwarded Message
Received: from PACIFIC-CARRIER-ANNEX.MIT.EDU by po9.MIT.EDU (5.61/4.7) id AA14861; Wed, 4 Jun 97 08:20:09 EDT
Received: from MITVMA.MIT.EDU by MIT.EDU with SMTP
id AA07508; Wed, 4 Jun 97 08:19:16 EDT
Received: from MITVMA.MIT.EDU by mitvma.mit.edu (IBM VM SMTP V2R3)
with BSMTP id 2390; Wed, 04 Jun 97 08:19:50 EDT
Received: from MITPPL.BITNET (NJE origin OPCTEMP2@MITPPL) by MITVMA.MIT.EDU
(LMail V1.2b/1.8b) with BSMTP id 6785; Wed, 4 Jun 1997 08:19:50 -0400
Received: from MITPPL.BITNET by MITPPL.BITNET (PMDF #12255) id
<01IJO22OCXCG8WWIR4@MITPPL.BITNET>; Wed, 4 Jun 1997 08:18 EDT
Date: Wed, 4 Jun 1997 08:18 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
Subject: Bldg. 14 Shutdown Request - Floors 1 thru 5
To: larugsi@MIT.EDU
Message-Id: <01IJO22OCXCG8WWIR4@MITPPL.BITNET>
X-Envelope-To: larugsi@mit.edu
X-Vms-To: IN%"larugsi@mit.edu"
Lou,
I'm sorry, I didn't indicate the floors that would be affected. This
shutdown will affect floors 1 thru 5 only (see sample room listing
below).
In talking with Ruth Davies yesterday afteroon, she informed me that
demolition will take place from June 16 thru July 16th. Apparently this
will more of a cosmetic renovation rather than a total demolition. I
will try to find out more if you haven't been informed of this.
Also she and Warren are negotiating about whether this will take place
on a weekend (she would prefer this weekend and he would prefer that
the shutdown take place during the demolition period). More about that later
also. FYI.
Andrea
6/4 - 8:20 AM
The following shutdown request for Bldg. 14 South Wing, west end on a
week day date selected by you is for your information and comment.
Would you please let me know if this has your approval and when you
would want this work to take place.
Thank you.
Andrea Nichols
Operations Center
8-7872
Building: 14 South Wing, west end: Example of rooms to be
affected are S-103, S-138, S-130, S-134, S205 thru 222 and
the rooms directly above them up to and including floor 5
System: Air Handler 4
Date: Open
Day: Open
Time: Open
Duration: 10 to 24 hours
Reason: Replace bearings and shaft (if needed). Also install
new motor mount.
Effect: Loss of supply ventilation, supply cooling and supply
heating.
Hi Andrea,
We have 8 systems stationed in the 14-0330 area in the
Hayden Library. Will this area be affected by the above
shutdown? If so, special arrangements will have to be made.
--Lou 6/3/97