[37469] in Hotline Meeting
Shutdown Requests - Bldgs. 44, 45 and 48 - 4/1
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Tue Mar 18 15:22:42 1997
Date: Tue, 18 Mar 1997 15:22 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, schedule@MIT.EDU, opsnote@MIT.EDU, adams@mitlns.mit.edu,
jmganno@MIT.EDU, shyoung@MIT.EDU, sfrankel@MIT.EDU,
mistetri@deslab.mit.edu
X-Envelope-To: jmganno@mit.edu, opsnote@mit.edu, schedule@mit.edu,
sfrankel@mit.edu, shutdowns@mit.edu, shyoung@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, schedule@mit.edu, opsnote@mit.edu, adams@mitlns.mit.edu,
jmganno@mit.edu, shyoung@mit.edu, sfrankel@mit.edu, mistetri@deslab.mit.edu"
The following shutdown request for Bldgs. 44, 45 and 48 on 4/1 is for
your information and comment. Would you please let me know if this has
your approval or not.
Thank you.
Andrea Nichols
Operations Center
8-7872
Bldg: 44
System: Normal Electrical Power: Back-up generators will be
used between 7AM and 9AM.
Date: 4/1
Day: Tuesday
Time: 7:00 AM - 9:00 AM
Duration: 2 hours
Reason: Power plant modifications
Effect: Momentary loss of power: access controls, building power,
elevators, computers, telephones and lighting; air: supply
ventilation, supply cooling, supply heating, exhaust laboratory
general exhaust, toilet exhaust, compressed control and
compressed lab air as well as condensate return (steam).
Note: Back-up generators will be used during 7 - 9 AM.
There will be a slight interruption of power
(approximately 15 - 30 seconds) during this
changeover and again at 9:00 AM when the normal
electrical power will be turned back on.
Building: 45
System: Normal Electrical Power
Date: 4/1
Day: Tuesday
Time: 7:00 AM - 9:00 AM
Duration: 2 hours
Reason: Power Plant Modifications
Effect: Momentary loss of power: access controls, bldg. power,
elevators, computers, telephones, lighting; air: supply
ventilation, cooling, heating, laboratory exhaust,
general exhaust, compressed control, compressed lab and lab
vacuum air as well as condensate return (steam).
Note: At 7:00 AM there will be a brief interruption of power
(approx. 15 - 30 seconds) while the building is transferred to
the generator power.
There will be another brief interruption at 9:00 AM
while the building is transferred back to normal power.
Building: 48
System: Normal Electrical Power
Date: 4/1
Day: Tuesday
Time: 7:00 AM - 9:00 AM
Duration: 2 hours
Reason: Power Plant Modifications
Effect: Momentary loss of power: access controls, bldg. power,
elevators, computers, telephones, lighting; air: supply
ventilation, cooling, heating, laboratory exhaust,
general exhaust, control compressed, compressed lab air and
condensate return (steam).
With the exception of the WAVE TANK equipment, the
entire building will be repowered during the period from
7:00 AM until 9:00 AM (brief interruption of power at 7:00 AM
and then again at 9:00 AM)