[36829] in Hotline Meeting
Emergency Shutdown - Bldg. 26 - 2/12
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Mon Feb 10 13:04:12 1997
Date: Mon, 10 Feb 1997 13:00 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, schedule@MIT.EDU, adams@mitlns.mit.edu,
gfp170@mitrlevm.mit.edu, blair@MIT.EDU, b-zone@MIT.EDU
X-Envelope-To: b-zone@mit.edu, blair@mit.edu, schedule@mit.edu,
shutdowns@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, schedule@mit.edu, adams@mitlns.mit.edu, gfp170@mitrlevm.
mit.edu, blair@mit.edu, b-zone@mit.edu"
The following emergency shutdown for Bldg. 26 for 2/12 is for your
information. If you have any concern about this, please feel free to
contact me.
Thank you.
Andrea Nichols
Operations Center
8-7872
Building: 26 - Entire Bldg.-restroom facilities, sinks,
drinking fountains, labs
System: Domestic and lab process water, both hot and cold
Date: 2/12
Day: Wednesday
Time: 5:00 AM - 10:00 AM
Duration: 5 hours
Reason: Valve needs to be replaced to isolate Bldg. 16 for
Beacon Construction Co.
Effect: Loss of all domestic and lab water (both hot and cold)
during shutdown.