[36496] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Filter Change Notification - Bldg. 31 & 37-484 - 1/17/97

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Thu Jan 16 08:35:18 1997

Date: Thu, 16 Jan 1997 08:32 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, schedule@MIT.EDU, bcorkum@MIT.EDU, ameswf@MIT.EDU,
        pcollymo@MIT.EDU, rcf@space.mit.edu
X-Envelope-To: ameswf@mit.edu, bcorkum@mit.edu, pcollymo@mit.edu,
 schedule@mit.edu, shutdowns@mit.edu
X-Vms-To: 
 IN%"shutdowns@mit.edu, schedule@mit.edu, bcorkum@mit.edu, ameswf@mit.edu, pcoll
   ymo@mit.edu, rcf@space.mit.edu"

The following filter change notification for Bldgs. 31 & 37-484 for
1/17 is for your information and comment. If you have a concern, please
feel free to contact me.

Thank you.

Andrea Nichols
Operations Center/PM Office
8-7872

Building:       31 - 231RL, 156CF, 153RA, 063A, 049RL, 040B, 000R &
                37-484 (Clean Rm.)
System:         Fan Coil Units - Bldg. 31 - Air Handler 2/ Supply Fan
                PM#716018 - 37-484
Date:           1/17/97
Day:            Friday
Time:           8:00 AM - 11:30 AM
Duration:       3 1/2 hours
Reason:         23 Filter Changes - Bldg. 31 - 19 filter changes - Bldg. 37
Effect:         None - no equipment will be shut down during filter changes.

                Note: If there is paperwork or other items either on
                top of or beneath the fan coil units, please be sure to remove
                them so that the filter people can easily access the units.

                Thank you.



home help back first fref pref prev next nref lref last post