Re: 38-370

daemon@ATHENA.MIT.EDU (larugsi@MIT.EDU)
Wed Jan 8 13:21:08 1997

From: larugsi@MIT.EDU
To: hotline@MIT.EDU
Date: Wed, 08 Jan 1997 13:20:59 EST


------- Forwarded Message

Received: from PACIFIC-CARRIER-ANNEX.MIT.EDU by po9.MIT.EDU (5.61/4.7) id AA27533; Wed, 8 Jan 97 11:34:30 EST
Received: from MITVMA.MIT.EDU by MIT.EDU with SMTP
	id AA13333; Wed, 8 Jan 97 11:34:29 EST
Received: from MITVMA.MIT.EDU by mitvma.mit.edu (IBM VM SMTP V2R3)
   with BSMTP id 9680; Wed, 08 Jan 97 11:34:35 EST
Received: from MITPPL.BITNET (NJE origin OPCTEMP2@MITPPL) by MITVMA.MIT.EDU
 (LMail V1.2b/1.8b) with BSMTP id 3094; Wed, 8 Jan 1997 11:34:35 -0500
Received: from MITPPL.BITNET by MITPPL.BITNET (PMDF #12255) id
 <01IDYW07UTLC8X9UQV@MITPPL.BITNET>; Wed, 8 Jan 1997 11:31 EDT
Date: Wed, 8 Jan 1997 11:31 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
Subject: Further Information Re 38-370 - Shutdown Request
To: larugsi@MIT.EDU, ghughes%MITPPL.bitnet@mitvma.mit.edu
Message-Id: <01IDYW07UTLC8X9UQV@MITPPL.BITNET>
X-Envelope-To: larugsi@mit.edu
X-Vms-To: IN%"larugsi@mit.edu, ghughes@mitppl.mit.edu"

Lou, Gerry,

I found out that 38-370 is in the southwestern part of Bldg. 38 - more
in the souther portion of the building though.

Lou, I just spoke w/Gerry Hughes in Physical Plant. Would it be possible to
have this shutdown on 1/15-1/16 anywhere between 8:00 PM and 8:00 AM?

Please advise and thanks.

Andrea
1/8 - 11:30 AM

The following requested shutdown for Bldg. 38 - South Ofices - Floors
1-6 for anywhere from 1/13 to 1/31 is for your information and review.
As you will see, the date, time is up to you. Physical Plant folks can
come in over the weekend, begin work at 4:00 AM or from 11:00 PM to the
next morning. It is up to you and we would most appreciate your
suggestion.

Please advise and thank you.

Andrea Nichols
Operations Center
8-7872

Building:       38 - South Offices - Floors 1-6
System:         Supply ventilation, cooling  and heating

                PM#701939 - Supply Fan/Air Handler 3 A & B
                PM#701994 - Return Fan 3
Date:           Between 1/15 and 1/16
Day:            Wednesday PM - Thursday AM
Time:           Between 8:00 PM - 1/15 and 8:00 AM 1/16
Duration:       4 - 6 hours
Reason:         Replace bearings for Return Fan #3
Effect:         Loss of supply ventilation, cooling and heating

                Please note:  Physical Plant needs 5 day's notice
                based on scheduled date to set up. Confined space
                entry permit required.


     Hi Andrea,
              We have a General Athena cluster located in 38-370. If this
is considered the south side, the cluster is scheduled to be shutdown for
washing/waxing on 1/15/97 at 8:00pm. Cluster is scheduled to re-open on
1/16/97 at 8:00am.
              If 38-370 is not on the south side, you have 1410's O.K.
              Please let us know one way or the other, because other steps
              need to take place regarding the integrity of the systems in the
              38-370 location.
                                    Thanks Much,
                                               --Lou  1/3/97
/* ---------- */

------- End of Forwarded Message