The Final Request for Shutdown - Bldg. E18 and parts of E17 - 1/10/97

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Tue Jan 7 13:51:27 1997

Date: Tue, 7 Jan 1997 13:49 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, e-zone@MIT.EDU, wardd@MIT.EDU, aufiero@mitvma.mit.edu,
        shyoung@MIT.EDU, jmganno@MIT.EDU, blair@mitvma.mit.edu,
        bethant@MIT.EDU, cipriano@mitvaps.mit.edu, cmartin@MIT.EDU
X-Envelope-To: bethant@mit.edu, cmartin@mit.edu, e-zone@mit.edu,
 jmganno@mit.edu, shutdowns@mit.edu, shyoung@mit.edu, wardd@mit.edu
X-Vms-To: 
 IN%"shutdowns@mit.edu, e-zone@mit.edu, wardd@mit.edu, aufiero@mitvma.mit.edu, s
   hyoung@mit.edu, jmganno@mit.edu, blair@mitvma.mit.edu, bethant@mit.edu, cipri
   ano@mitvaps.mit.edu, cmartin@mit.edu"

The following rescheduled requested shutdown for Bldgs. E18 and parts
of E-17 for 1/10/97 is for your information and comment. Please advise
if this rescheduled shutdown has your approval or not.

There will be three (3) shutdown requests for this project. The first
is as shown below, the second request will probably be around or on
1/17 for approx. 4-5 hours and the final will be around 2/15 for 30
minutes.

Thank you.

Andrea Nichols
Operations Center
8-7872

Building:       E17 and E18
System:         Power and Light
Day:            1/10/97
Day:            Friday
Time:           4 - 7 AM (formerly 4-6 AM)
Duration:       3 hours
Reason:         Remove buss duct switch on 4th floor -take measurements
                for construction of replacement
Effect:         Loss of access controls, building power, telephones
                and lighting as follows:

                E18 - 101, 103, 172 thru 171, 173 thru 175, 120 and 121

                E18 - 207S thru 216, 221 thru 231, 234 thru 220, 219
                thru 207K and all offices in between this block of numbers

                E18 - 311D thru 301b, 356 to 350, 350A to 379, 301A
                thru 375 and all offices and labs between this block of numbers

                E18 - 421 thru 427, 415, 409, 419 thru 471, 473 thru
                480, 429 thru 402 and all offices and labs in between
                this block of numbers

                E18 - 501A thru 577B, 501B, 570, 568 thru 560, 561 thru
                577 and all offices and labs in tetween this block of numbers

                E18 - 601 thru 615, 677B thru 629, 611 thru 627 and all offices
                labs and animal quarters within this block of numbers

                *rooms 604 thru 677 which included 660A and 672 will
                not be shut down as originally stated.

                E17 - 346, 347, 342B, 347 thru 333, 334

                E17 - 431 thru 443, 430A thru 445A, 432 thru 447

                E17 - 633 thru 643H, 630 thru 643a, 684 thru 685A, 640
                thru 633A, 639 thru 632, 631, 610 thru 624, 617 thru 615, 614A