[34497] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Requested shutdown - Bldg. 13-5023, 4048, 4011, 3031, 3055, 5011,

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Tue Aug 27 11:50:40 1996

Date: Tue, 27 Aug 1996 11:45 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, dhenry5@MIT.EDU
X-Envelope-To: dhenry5@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu, dhenry5@mit.edu"

The following requested shutdown for Bldg. 13 for 8/30 is for your
information and review. Would you please let me know if this shutdown
is acceptable or unacceptable.

Thanks very much.

Andrea Nichols
Operations Center
8-6651

Building:       13 - Fan Room "B" (5-2023) and rooms 4048, 4011, 3031,
                3035, 5011, 5023, 5024, 3023, 2011, 3024, 5027, 3015,
                5016, 2036, 701801, 701802, 701803, 701804, 717330,
                701805, 701806, 701807, 701808, 701365, 701809, 701811
                and 701810
System:         Laboratory exhaust fans, general exhaust fans and
                toilet exhaust fans
Date:           8/30/96
Day:            Friday
Time:           7:00 AM - 2:00 PM (or more or less)
Duration:       6 hours (or more or less)
Reason:         Permanently fasten exhaust stacks (reroofing)
Effect:         Loss of laboratory, general and toilet exhaust fans
                during shutdown period.


home help back first fref pref prev next nref lref last post